Precast Prestressed Concrete Through-Girder System for Shallow Bridge Structures

被引:0
|
作者
Sun, C. Shawn [1 ]
机构
[1] Louisiana Tech Univ, Civil Engn & Construct Engn Technol, 600 Dan Reneau Dr,POB 10348, Ruston, LA 71272 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents an innovative precast through-girder system that involves using ultra-high performance concrete (UHPC) in connections. This can be adopted in shallow bridge structures and achieves both enhanced durability and simplified construction. The superstructure proposed includes precast concrete through-girder segments that are spliced longitudinally through post-tensioning. It also includes precast prestressed double-tee transverse beams that span between the through girders. An important feature of this system is that it uses UHPC at the transverse joints between adjacent transverse beams, as well as at the longitudinal joints between the transverse beams and the through girders. The use of UHPC allows the joint widths to be minimized and eliminates the need for longitudinal post-tensioning across the transverse joints, which simplifies and accelerates construction. Further, using UHPC enhances structural performance overall significantly and reduces maintenance costs.
引用
收藏
页码:145 / 153
页数:9
相关论文
共 50 条
  • [1] Development of a precast prestressed concrete through-girder system for shallow bridge structures
    Sun, Chuanbing
    Farzana, Nahid
    Kuruppuarachchi, Dinesha
    Babarinde, Oluwatobi
    [J]. STRUCTURAL CONCRETE, 2021, 22 (03) : 1574 - 1585
  • [2] UHPC Through-Girder System for Shallow Bridge Structures
    Sun, Chuanbing
    Farzana, Nahid
    Babarinde, Oluwatobi
    Kuruppuarachchi, Dinesha
    [J]. STRUCTURES CONGRESS 2020, 2020, : 193 - 205
  • [3] Ave River Bridge - A major precast prestressed concrete U-Girder Bridge in Portugal
    Cruz, PJS
    Wisniewski, DF
    [J]. PCI JOURNAL, 2004, 49 (04): : 72 - 86
  • [4] Precast prestressed winning structures in PCA Concrete Bridge Competition
    不详
    [J]. PCI JOURNAL, 2003, 48 (03): : 134 - 139
  • [5] Full depth precast, prestressed concrete bridge deck system
    Yamane, T
    Tadros, MK
    Badie, SS
    Baishya, MC
    [J]. PCI JOURNAL, 1998, 43 (03): : 50 - +
  • [6] Full depth precast prestressed concrete deck panels for a large steel box girder bridge
    Price, K
    Burroughs, D
    He, YE
    Haines, SR
    [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 312 - 319
  • [7] Full depth precast prestressed concrete deck panels for a large steel box girder bridge
    Price, K
    Burroughs, D
    He, YE
    Haines, SR
    [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 312 - 319
  • [8] Experimental and numerical response of a 1915 riveted through-girder bridge
    Linzell, DG
    Nevling, DL
    Kollias, AA
    Laman, JA
    [J]. DESIGN OF STRUCTURES 2002: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2002, (1814): : 127 - 134
  • [9] DEMOLITION OF PRECAST PRESTRESSED CONCRETE STRUCTURES
    TOMITA, K
    SUEYOSHI, K
    YAMADA, H
    SUMI, K
    [J]. DEMOLITION AND REUSE OF CONCRETE AND MASONRY, VOLS 1-2: DEMOLITION METHODS AND PRACTICE ; REUSE OF DEMOLITION WASTE, 1988, : 368 - 377
  • [10] PRECAST PRESTRESSED CONCRETE BRIDGE DECK PANELS
    不详
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1987, 32 (02): : 26 - 45