Test approach of downhole pump diagram for beam bumping wells

被引:1
|
作者
Jia Deli [1 ,2 ]
Liu He [1 ]
Pei Xiaohan [1 ]
Wang Guoqing [3 ]
Yang Qinghai [1 ]
Wang Yao [2 ]
机构
[1] PetroChina Res Inst Petr Explorat & Dev, Beijing 100083, Peoples R China
[2] Harbin Univ Sci & Technol, Harbin 150080, Peoples R China
[3] PetroChina Daqing Oilfield Co, Res Inst Prod Engn, Daqing 163453, Peoples R China
关键词
pump unit; downhole pump diagram; stroke; acceleration; filter;
D O I
10.1016/S1876-3804(15)60015-5
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A direct test approach of downhole pump diagram for beam bumping wells was presented using acceleration transducer to measure the pump stroke, and it was verified through laboratory experiments and field tests. The feature of the low-frequency and weak signal exported from the acceleration transducer with impact interference was analyzed. The periodic signal and its drift were modeled to work out the accumulative error of long-term integration and its influence on measurement results. Based on elimination principles, the DC-blocking and denoising filter was designed and its mathematical model was established. Through the filter, the drift component can be separated from the acquired signal. The laboratory experiments and field tests indicate that, the displacement signal without drift can be obtained from the initial acceleration data through filtering and quadratic integral, thus the downhole pump diagram can be obtained; the data measurement error is within +/- 2.0%, which will be further reduced with the increase of stroke times; the test approach of downhole pump diagram can realize the calculation of pump effectiveness and the direct measurement of stroke loss, thereby providing criteria for the process analysis of beam bumping well.
引用
收藏
页码:123 / 128
页数:6
相关论文
共 50 条
  • [1] Test approach of downhole pump diagram for beam bumping wells
    Jia, Deli
    Liu, He
    Pei, Xiaohan
    Wang, Guoqing
    Yang, Qinghai
    Wang, Yao
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2015, 42 (01): : 111 - 116
  • [2] Vertical Interference Test in Wells With Downhole Water Sink Completions
    Shirman, Ephim
    Wojtanowicz, Andrew
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2009, 131 (03): : 0331031 - 03310311
  • [3] SCALE ASSESSMENT IN DOWNHOLE PUMP OF THE WELLS PRODUCING OIL AND GAS: CASE STUDY
    Cunha, J. D.
    Silva, F. N.
    Barbosa, A. F. F.
    Silva, D. R.
    HOLOS, 2016, 32 (07) : 209 - 217
  • [4] Test proves out triple-action pump in downhole separation
    Wacker, H. Jason
    Parker, Robert M.
    Stuebinger, Lon
    Harding, Ralph
    Watson, Brock
    Oil and Gas Journal, 1999, 97 (40): : 49 - 55
  • [5] Test proves out triple-action pump in downhole separation
    Wacker, HJ
    Parker, RM
    Stuebinger, L
    Harding, R
    Watson, B
    OIL & GAS JOURNAL, 1999, 97 (40) : 49 - +
  • [6] Downhole beam pump operation: Slippage and buckling forces transmitted to the rod string
    Nickens, H
    Lea, JF
    Cox, JC
    Bhagavatula, R
    Garg, D
    JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 2005, 44 (05): : 56 - 61
  • [7] Research on Vector Control System of Beam Pump Used in CBM Wells
    Bai Lijun
    Wang Zhengchong
    Wang Hao
    Zhuang Yuan
    Wang Cong
    2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 987 - 992
  • [8] An Approach to Generate Test Cases from Sequence Diagram
    Dhineshkumar, M.
    Galeebathullah
    2014 INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING APPLICATIONS (ICICA 2014), 2014, : 345 - 349
  • [9] The systems approach to designing of diagram of deposits drilling by horizontal and multiple hole wells
    Bastrikov, SN
    Kharlamov, KN
    Kharlamov, AK
    Sheshukova, GN
    NEFTYANOE KHOZYAISTVO, 2005, (05): : 55 - 57
  • [10] Coiled tubing replaces sucker rods in beam pump test
    Leniek, H
    Ayestaran, L
    Yang, YS
    OIL & GAS JOURNAL, 1999, 97 (47) : 63 - 66