DUE-DATE ASSIGNMENT AND OPTIONAL MAINTENANCE ACTIVITY SCHEDULING PROBLEM WITH LINEAR DETERIORETING JOBS

被引:0
|
作者
Hsu, Chou-Jung [2 ]
Yang, Suh-Jenq [2 ]
Yang, Dar-Li [1 ]
机构
[1] Natl Formosa Univ, Dept Informat Management, Yunlin 632, Taiwan
[2] Nan Kai Univ Technol, Dept Ind Engn & Management, Nan Tou 542, Taiwan
来源
关键词
scheduling; linear deterioration; due-data assignment; maintenance activity; earliness; tardiness; SINGLE-MACHINE; PROCESSING TIMES; PENALTIES; MAKESPAN;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The focus of this work is to analyze linear deteriorating jobs in a single-machine scheduling problem with due-date assignment and maintenance activity. The linear deteriorating jobs means its processing time is an increasing function of their starting time. The objective is to minimize the total of earliness, tardiness and due-date cost. To solve the scheduling problem addressed in this work, we have to determine the job sequence, the common due-date, and the location of a maintenance activity. We show that the problem can be solved optimally in O(n(2) log n) time.
引用
收藏
页码:97 / 100
页数:4