A Case Study about Biomass Torrefaction on an Industrial Scale: Solutions to Problems Related to Self-Heating, Difficulties in Pelletizing, and Excessive Wear of Production Equipment

被引:26
|
作者
Nunes, Leonel J. R. [1 ,2 ,3 ,4 ]
机构
[1] IPVC Inst Politecn Viana Castelo, ESA, PROMETHEUS, Rua Escola Ind & Comercial Nun Alvares, P-4900347 Viana Do Castelo, Portugal
[2] Univ Aveiro, DEGEIT, GOVCOPP, Campus Univ Santiago, P-3810193 Aveiro, Portugal
[3] YGE Yser Green Energy SA, Area Acolhimento Empresarial Ul Loureiro, Lote 17, P-3720075 Loureiro, OAZ, Portugal
[4] AFS Adv Fuel Solut SA, Area Acolhimento Empresarial Ul Loureiro, Lote 17, P-3720075 Loureiro, OAZ, Portugal
来源
APPLIED SCIENCES-BASEL | 2020年 / 10卷 / 07期
关键词
torrefaction; process bottlenecks; self-heating; volatiles; equipment wear; ENERGY-CONSUMPTION; ECONOMIC-GROWTH; FRESH EVIDENCE; COAL; PERFORMANCE; EFFICIENCY; LIGNIN; FIRE;
D O I
10.3390/app10072546
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The search for different forms of biomass that can be used as an alternative to those more traditional ones has faced numerous difficulties, namely those related to disadvantages that the majority of residual forms present. However, these residual forms of biomass also have advantages, namely the fact that, by being outside the usual biomass supply chains for energy, they are usually much cheaper, and therefore contribute to a significant reduction in production costs. To improve the less-favorable properties of these biomasses, thermochemical conversion technologies, namely torrefaction, are presented as a way to improve the combustibility of these materials. However, it is a technology that has not yet demonstrated its full potential, mainly due to difficulties in the process of scale-up and process control. In this article it is intended to present the experience obtained over 5 years in the operation of a biomass torrefaction plant with an industrial pilot scale, where all the difficulties encountered and how they were corrected are presented, until it became a fully operational plant. This article, in which a real case study is analyzed, presents in a descriptive way all the work done during the time from when the plant started up and during the commissioning period until the state of continuous operation had been reached.