共 50 条
- [2] The Design of Fund Incentive Contract Based on the Choice of Effort and Risk of Manager [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 494 - 500
- [3] Fall and Rise of the Largest Construction Manager-at-Risk Transportation Construction Project Ever [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (09): : 930 - 938
- [5] Coordination of port service chain with an integrated contract [J]. SOFT COMPUTING, 2020, 24 (09) : 6245 - 6258
- [6] Coordination of port service chain with an integrated contract [J]. Soft Computing, 2020, 24 : 6245 - 6258
- [9] Study on the Influence of Benchmark on the Design of Fund Incentive Contract Based on the Effort and Risk Choice of Manager [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 9834 - 9838
- [10] Reliability by Construction using Design by Contract Methodology [J]. PROCEEDINGS OF THE 9TH INDIA SOFTWARE ENGINEERING CONFERENCE, 2016, : 201 - 202