Comprehensive mine planning: An integral component to cement plant operations

被引:0
|
作者
Hisert, RA [1 ]
机构
[1] H2H Assoc LLC, Malta, NY USA
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Comprehensive Mine Planning incorporates multiple components of the quarry, including its physical, environmental, regulatory, and geologic settings, along with operations and maintenance. In concert with the market-driven demands of the cement plant, the quarry management must have adequate planning to respond to changes in the market and be prepared to meet short and long-term demands for production stone. In order to be successful, a mine plan must be based on representative and reliable data, and be user friendly to all personnel involved in the production of cement. A mine plan must be revisited and updated on a regular basis, as market-driven factors, snf/or the physical, environmental, regulatory, and operational settings around the quarry change. Single component quarry planning (planning only a single function within the quarry) can lead to inefficient and costly operations, duplicate efforts, regulatory violations, and permitting delays. Comprehensive Mine Planning that is performed early in the life of the quarry, and is regularly updated, is a valuable tool in determining the limiting function in the quarry, uncovering problems prior to "emergencies," allowing for cost-effective management and maximizes the future potential of the quarry. Moreover, these plans have the potential to provide leverage for cement plant managers to improve plant-side operations.
引用
收藏
页码:229 / 236
页数:8
相关论文
共 50 条
  • [1] 3D Geologic Modelling and Mine Planning to Improve Quarry and Plant Efficiency at Cement Operations
    Rotz, Mark
    Trynoski, Rich
    [J]. 2018 IEEE-IAS/PCA CEMENT INDUSTRY CONFERENCE (IAS/PCA), 2018,
  • [2] Backfill: An integral component of mine production
    Henderson, A
    Morrison, D
    [J]. SEVENTH AUSIMM UNDERGROUND OPERATORS' CONFERENCE, 1998, 98 (03): : 207 - 209
  • [3] Planning the mining operations at Kumtor mine
    Rogers, T.
    Schlesser, F.
    Chunuev, I.K.
    [J]. Gornyi Zhurnal, 2001, (10): : 105 - 112
  • [4] A Review of Operations Research in Mine Planning
    Newman, Alexandra M.
    Rubio, Enrique
    Caro, Rodrigo
    Weintraub, Andres
    Eurek, Kelly
    [J]. INTERFACES, 2010, 40 (03) : 222 - 245
  • [5] Cement plant covered by mine act
    Smith, Ellen
    Aclander, Melanie
    [J]. Pit and Quarry, 2002, 95 (03):
  • [6] Operations Research in Underground Mine Planning: A Review
    Chowdu, Akshay
    Nesbitt, Peter
    Brickey, Andrea
    Newman, Alexandra M.
    [J]. INFORMS JOURNAL ON APPLIED ANALYTICS, 2022, 52 (02): : 109 - 132
  • [7] Mine planning at Newmont's Nevada operations
    Hoerger, Steve
    Hoffman, Lee
    Seymour, Fred
    [J]. Mining Engineering (Littleton, Colorado), 1999, 51 (10):
  • [8] COMPUTERS - A PRACTICAL TOOL FOR MINE PLANNING AND OPERATIONS
    EFRAMIAN, M
    [J]. MINING CONGRESS JOURNAL, 1981, 67 (11): : 27 - 30
  • [9] DYNAMIC INTEGRATED MINE PLANNING GEOLOGIC COMPONENT
    ARGUILE, S
    LYONS, B
    NIKOLS, D
    [J]. CIM BULLETIN, 1987, 80 (902): : 17 - 17
  • [10] DYNAMIC INTERDISCIPLINARY MINE PLANNING - THE GEOTECHNICAL COMPONENT
    NADERI, F
    NIKOLS, D
    WADE, N
    [J]. CIM BULLETIN, 1987, 80 (902): : 19 - 19