共 50 条
- [1] Influence of alternate operation on clogging in a vertical-flow constructed wetland Huanjing Kexue Xuebao, 2008, 8 (1555-1560):
- [2] Clogging mechanism in vertical-flow constructed wetland: Clogging cause and accumulation distribution characteristics Huanjing Kexue/Environmental Science, 2008, 29 (06): : 1508 - 1512
- [4] The Impact of Hydraulic Loading on the Decontamination Effect of Integrated Vertical-Flow Constructed Wetland CONFERENCE ON ENVIRONMENTAL POLLUTION AND PUBLIC HEALTH, VOL 1-2, 2010, : 1144 - 1147
- [5] Effects of nutrients on the substrate biofilms in the integrated vertical-flow constructed wetland FRESENIUS ENVIRONMENTAL BULLETIN, 2008, 17 (06): : 732 - 737
- [6] Reversing Clogging in Vertical-flow Constructed Wetlands by Backwashing Treatment MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 1064 - 1068
- [9] Effects of Solubilization Treatment and Intermittent Operation on Clogging in Vertical Flow Constructed Wetland 2013 THIRD INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEM DESIGN AND ENGINEERING APPLICATIONS (ISDEA), 2013, : 696 - 699