Effects of clogging on hydraulic behavior in a vertical-flow constructed wetland system: A modelling approach

被引:20
|
作者
Yang, Mengyao [1 ,3 ]
Lu, Mingzhi [2 ]
Bian, Hongfeng [1 ]
Sheng, Lianxi [1 ]
He, Chunguang [1 ]
机构
[1] Northeast Normal Univ, Sch Environm, State Environm Protect Key Lab Wetland Ecol & Veg, Changchun 130117, Jilin, Peoples R China
[2] Northeast Normal Univ, Inst Grassland Sci, Minist Educ, Key Lab Vegetat Ecol, Changchun 130024, Jilin, Peoples R China
[3] Chinese Acad Sci, Key Lab Wetland Ecol & Environm, Northeast Inst Geog & Agroecol, Changchun 13012, Jilin, Peoples R China
关键词
Vertical flow constructed wetland; Hydraulic behavior; Clogging; Tracer test; Computational fluid dynamics; SOLIDS ACCUMULATION; SUBSURFACE; TRACER; WATER; PERFORMANCE; CONFIGURATION; EFFICIENCY; REMOVAL; PATTERN; DESIGN;
D O I
10.1016/j.ecoleng.2017.09.010
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
The hydrological behavior of subsurface flow constructed wetlands changes with the operation time due to the gradual clogging of the matrix pores. However, studies on changes in hydraulics associated with the clogging process in constructed wetlands are still inadequate, with the variations of internal flow field that cause changes of hydraulic behavior still unknown. Conservative tracer tests and Computational Fluid Dynamics (CFD) software Fluent 6.3 were combined in this study to analyze the effect of clogging on hydraulic behavior in a vertical-flow constructed wetland experimental system. As the porosity of the experimental system decreased from 0.3669 to 0.316 caused by clogging, both the nominal hydraulic retention time and the actual average retention time decreased sharply, with the latter dropping even faster, indicating that the reduction of the pore volume caused by clogging is not the only reason for the decrease in the actual hydraulic retention time. During the experimental period, the system had a serious short-circuiting and mixing phenomenon, and the dead zone area was rather large. The overall hydraulic efficiency was poor. According to the CFD simulation results, which were verified by Nash-Sutcliffe efficiency factor (NSE), the flow rate in the experimental system increased with the operation time. Correspondingly, the time required to pass through the matrix pores decreased, which contributed to an additional drop in hydraulic retention time, along with the decrease of porosity.
引用
收藏
页码:41 / 47
页数:7
相关论文
共 50 条
  • [1] Influence of alternate operation on clogging in a vertical-flow constructed wetland
    Shanghai Academy of Environmental Sciences, Shanghai 200233, China
    不详
    Huanjing Kexue Xuebao, 2008, 8 (1555-1560):
  • [2] Clogging mechanism in vertical-flow constructed wetland: Clogging cause and accumulation distribution characteristics
    Ye, Jian-Feng
    Xu, Zu-Xin
    Li, Huai-Zheng
    Huanjing Kexue/Environmental Science, 2008, 29 (06): : 1508 - 1512
  • [3] Hydraulic behaviour of vertical-flow constructed wetland under different operating conditions
    Panuvatvanich, Atitaya
    Koottatep, Thammarat
    Kone, Doulaye
    ENVIRONMENTAL TECHNOLOGY, 2009, 30 (10) : 1031 - 1040
  • [4] The Impact of Hydraulic Loading on the Decontamination Effect of Integrated Vertical-Flow Constructed Wetland
    Zhang, Jiku
    Liu, Yan
    Zou, Lin
    CONFERENCE ON ENVIRONMENTAL POLLUTION AND PUBLIC HEALTH, VOL 1-2, 2010, : 1144 - 1147
  • [5] Effects of nutrients on the substrate biofilms in the integrated vertical-flow constructed wetland
    Zhang, Jin-lian
    Liang, Wei
    He, Feng
    Cheng, Shui-ping
    Wu, Zhen-bin
    FRESENIUS ENVIRONMENTAL BULLETIN, 2008, 17 (06): : 732 - 737
  • [6] Reversing Clogging in Vertical-flow Constructed Wetlands by Backwashing Treatment
    Fei, Ma
    Li, Jiang
    Ting, Zeng
    MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 1064 - 1068
  • [7] Estimation of nitrogen dynamics in a vertical-flow constructed wetland
    Ouyang, Y.
    Luo, S. M.
    Cui, L. H.
    ECOLOGICAL ENGINEERING, 2011, 37 (03) : 453 - 459
  • [8] Performance of loach to reduce clogging matter in vertical-flow constructed wetlands: Hydraulic evaluation and metabolic processes
    Fu, Xiuzheng
    Kong, Fanlong
    Duan, Pingping
    Li, Fanyi
    Hu, Wenxuan
    Liu, Xiaomin
    Yu, Zhengda
    Cui, Yuqian
    CHEMICAL ENGINEERING JOURNAL, 2024, 498
  • [9] Effects of Solubilization Treatment and Intermittent Operation on Clogging in Vertical Flow Constructed Wetland
    Hua, Guo-fen
    Zhu, Wei
    Zhang, Yun-hui
    2013 THIRD INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEM DESIGN AND ENGINEERING APPLICATIONS (ISDEA), 2013, : 696 - 699
  • [10] Removal of dibutyl phthalate by a staged, vertical-flow constructed wetland
    Zhao, WY
    Wu, ZB
    Zhou, QH
    Cheng, SP
    Fui, GP
    He, F
    WETLANDS, 2004, 24 (01) : 202 - 206