Economic Planning of Energy System Equipment

被引:0
|
作者
Li, Biao [1 ]
Wang, Tao [2 ]
Dong, Zhen [1 ]
Geng, Qian [3 ]
Sun, Yi [3 ]
机构
[1] State Grid Hebei Elect Power Co Ltd, Shijiazhuang 050021, Hebei, Peoples R China
[2] Hangzhou Dianzi Univ, Informat Engn Sch, Hangzhou 311305, Peoples R China
[3] State Grid Hebei Elect Power Res Inst, Shijiazhuang 050021, Hebei, Peoples R China
关键词
asset wall; Weibull distribution; Monte Carlo stochastic simulation; VMD; Elman; WOA;
D O I
10.3390/su141811464
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The asset wall (AW) model is widely used by energy companies to forecast the retirement size of equipment. The AW model is a method of arranging historical data in chronological order and then using extrapolation to predict trends in asset size volumes over time. However, most studies using the AW model treat all equipment as a whole and perform a flat extrapolation mechanically, ignoring the impact of technological improvements and price fluctuations. Furthermore, there are relatively few studies on the assetization of equipment replacement scale. This paper fits a Weibull distribution density function and uses Monte Carlo stochastic simulation to determine the retirement age of each piece of equipment, reducing the ambiguity and randomness generated by the AW approach of treating all equipment as a whole. This modified model is noted in this paper as the Weibull-Monte Carlo stochastic simulation asset model wall (WMCAW). The paper then investigated the assetization of equipment replacement size, comparing the three error indicators Mean Absolute Error (MAE), Mean Absolute Percentage Error (MAPE), and Root Mean Square Error (RMSE) in order to select the appropriate optimization model for price forecasting from several combinations of models. Finally, the paper verified the feasibility of the WMCAW model using various types of equipment decommissioned in 1970 and compared the forecasting effects of AW and WMCAW. It is found that the curve of the equipment replacement scale predicted by WMCAW is smoother than that of AW, and the forecasting results are more stable and scientific.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] PLANNING FOR ECONOMIC JUSTIFICATION OF EQUIPMENT
    DELLAPE, MJ
    [J]. SAE TRANSACTIONS, 1967, 75 : 101 - &
  • [2] Robust planning and economic analysis of park-level integrated energy system considering photovoltaic/thermal equipment
    Zhang, Chaoyi
    Jiao, Zaibin
    Liu, Junshan
    Ning, Keer
    [J]. APPLIED ENERGY, 2023, 348
  • [3] Integrated Energy System Planning Optimization Considering Equipment Performance
    Li, Haifeng
    Chen, Lufeng
    Feng, Gang
    Wang, Yongli
    Ma, Yang
    Xue, Lu
    Ma, Yuze
    Qi, Chengyuan
    [J]. 2020 INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND BIOENGINEERING (ICEEB 2020), 2020, 185
  • [4] Integrated energy system planning for a heavy equipment manufacturing industrial park
    Chen, Dongkun
    Cui, Qiushi
    Li, Dongdong
    Ren, Panqiu
    [J]. FRONTIERS IN ENERGY RESEARCH, 2024, 12
  • [5] CRITERIA FOR SYSTEM AND EQUIPMENT PLANNING
    STEPINSKI, B
    UNGRAD, H
    BERNEY, R
    [J]. BROWN BOVERI REVIEW, 1984, 71 (1-2): : 6 - 12
  • [6] ECONOMIC PLANNING OF SATELLITE EARTH STATION EQUIPMENT
    HAAGENSEN, HF
    [J]. POINT TO POINT TELECOMMUNICATIONS, 1969, 13 (01): : 37 - +
  • [7] System-technical optimization in energy-economic planning
    Fahl, U.
    Friedrich, R.
    Kaltschmitt, M.
    Reiner, R.
    Reuter, A.
    Thoene, E.
    [J]. Brennstoff-Waerme-Kraft, 1995, 47 (03): : 88 - 93
  • [8] SYSTEM-TECHNICAL OPTIMIZATION IN ENERGY-ECONOMIC PLANNING
    FAHL, U
    FRIEDRICH, R
    KALTSCHMITT, M
    REINER, R
    REUTER, A
    THONE, E
    [J]. BRENNSTOFF-WARME-KRAFT, 1995, 47 (03): : 88 - 93
  • [9] An optimal renewal planning of energy supply system from economic viewpoint
    Yoshida, Shu
    Gamou, Satoshi
    Ito, Koichi
    Enokido, Toshinori
    Yokoyama, Ryohei
    [J]. PROCEEDINGS OF THE ASME POWER CONFERENCE 2005, PTS A AND B, 2005, : 1477 - 1483
  • [10] Economic characteristics of highway self-consistent energy system planning
    Huang, Xian
    Ye, Xiao-Rong
    Ji, Wen-Tong
    Feng, Zhang-Jie
    [J]. Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2024, 24 (04): : 56 - 70