The long-term mine production scheduling problem

被引:31
|
作者
Sarin, SC [1 ]
West-Hansen, J [1 ]
机构
[1] Virginia Polytech Inst & State Univ, Grado Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
关键词
D O I
10.1080/07408170490447339
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Recognizing the complexity of coal mining management, e.g., the scarcity of financial resources and a variation in the quality of coal found in different sections of a mine, in this paper, we develop a mixed-binary programming model as an aid for generating mine production schedules in order to obtain coal of the desired quality and maximize the associated net present value. The model is based on the definition of the mine layout as a precedence network, with the nodes representing mining sections. A general solution methodology based on the Benders' decomposition of the model is developed. It exploits the special nature of the resulting subproblems in order to develop an effective solution procedure. Computational experience of this procedure, along with the results of its application to a mining case, are presented.
引用
收藏
页码:109 / 121
页数:13
相关论文
共 50 条
  • [1] Underground long-term mine production scheduling with integrated geological risk management
    Carpentier, S.
    Gamache, M.
    Dimitrakopoulos, R.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2016, 125 (02): : 93 - 102
  • [2] Integrated stochastic optimization of stope design and long-term underground mine production scheduling
    Furtado e Faria, Matheus
    Dimitrakopoulos, Roussos
    Lopes Pinto, Claudio Lucio
    [J]. RESOURCES POLICY, 2022, 78
  • [3] Long-term production planning problem: scheduling, makespan estimation and bottleneck analysis
    Arkhipov, Dmitry I.
    Battaia, Olga
    Lazarev, Alexander A.
    [J]. IFAC PAPERSONLINE, 2017, 50 (01): : 7970 - 7974
  • [4] FUEL RESOURCE SCHEDULING - THE LONG-TERM PROBLEM
    KUMAR, ABR
    VEMURI, S
    EBRAHIMZADEH, P
    FARAHBAKHSHIAN, N
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1986, 1 (04) : 145 - 151
  • [5] Integrated stochastic optimisation of stope design and long-term production scheduling at an operating underground copper mine
    Andrade, Laura Carelos
    Dimitrakopoulos, Roussos
    Conway, Phil
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2024, 38 (08) : 619 - 641
  • [6] A database application for long term production scheduling at LKAB's kiruna mine
    Kuchta, M
    [J]. APPLICATION OF COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, PROCEEDINGS, 2002, : 797 - 803
  • [7] Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling
    Topal, E.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2008, 108 (02) : 101 - 107
  • [8] Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling
    School of Engineering
    不详
    [J]. J S Afr Inst Min Metall, 2008, 2 (99-107):
  • [9] The long-term hydro-scheduling problem - a new algorithm
    Mantawy, AH
    Soliman, SA
    El-Hawary, ME
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2003, 64 (01) : 67 - 72
  • [10] Dealing with Negative Inflows in the Long-Term Hydrothermal Scheduling Problem
    Larroyd, Paulo Vitor
    Pedrini, Renata
    Beltran, Felipe
    Teixeira, Gabriel
    Finardi, Erlon Cristian
    Picarelli, Lucas Borges
    [J]. ENERGIES, 2022, 15 (03)