Production control policy for tandem workstations with constant service times and queue time constraints

被引:11
|
作者
Wu, Kan [1 ]
Zhao, Ning [2 ]
Gao, Liang [3 ]
Lee, C. K. M. [4 ]
机构
[1] Nanyang Technol Univ, Sch Mech & Aerosp Engn, Singapore, Singapore
[2] Kunming Univ Sci & Technol, Fac Sci, Kunming, Peoples R China
[3] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan, Peoples R China
[4] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
production control; process modelling; time window; MANUFACTURING SYSTEMS; CLUSTER TOOLS; MODELS; FABRICATION; LINES;
D O I
10.1080/00207543.2015.1129468
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Queue time constraints are commonly imposed to ensure product quality in contemporary production systems. We study the performance of two single stations with deterministic service times and a predetermined time window in between, where both stations suffer time-based pre-emptive breakdowns. To improve productivity, achieving higher capacity and lower rework rate are the two main objectives. While higher capacity requires a higher work-in-process (WIP)-level threshold, a lower rework rate requires a smaller one. To quantify the trade-off between the two objectives, an analytical model is derived. The model is then used to derive the WIP-level threshold control policy for a time-constrained system. We also show that system capacity diminishes with the decrease in WIP-level thresholds.
引用
收藏
页码:6302 / 6316
页数:15
相关论文
共 50 条