Initial experiences gained with the expanded deinking plant at Gebr. Lang GmbH

被引:0
|
作者
Sesterhenn, W [1 ]
Palm, C [1 ]
机构
[1] Lang GmbH Papierfabr, D-86833 Ettringen, Germany
来源
WOCHENBLATT FUR PAPIERFABRIKATION | 1998年 / 126卷 / 18期
关键词
D O I
暂无
中图分类号
TB3 [工程材料学]; TS [轻工业、手工业、生活服务业];
学科分类号
0805 ; 080502 ; 0822 ;
摘要
In December 1996, PM 4 of Gebr. Lang GmbH was rebuilt and an on-line Janus calender was installed, As a result the demand for high-grade DIP increased by 135% and could not possibly be met by line No. 2 with dual flotation that had been commissioned in 1992 end line No. I with single flotation. This is why the management decided in March 1997 to rebuild line No. 1. The article outlines the objectives of the rebuild, its concept and its implementation. Following a cost effectiveness evaluation, the results achieved are checked against the set aims.
引用
收藏
页码:859 / +
页数:4
相关论文
共 2 条
  • [1] Initial experiences gained with the expanded deinking plant at Gebr. Lang GmbH
    Sesterhenn, W.
    Palm, C.
    Wochenblatt fuer Papierfabrikation, 1998, 126 (18): : 859 - 863
  • [2] Gebruder Lang Papier GmbH completes deinking plant installation for new PM
    Rockhill, Rae Ann
    2000, Miller Freeman Inc, San Francisco, CA, United States (20):