A water supply risk assessment model for water distribution network

被引:11
|
作者
Choi, Taeho [1 ]
Koo, Jayong [1 ]
机构
[1] Univ Seoul, Dept Environm Engn, Seoul 130743, South Korea
关键词
ISM; Impact of pipe burst; Logistic regression analysis; Water supply risk; Pipe burst probability; DISTRIBUTION RELIABILITY; DISTRIBUTION-SYSTEMS; EARTHQUAKE;
D O I
10.1080/19443994.2014.892440
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A water supply risk (WSR) assessment model was developed for a water distribution network and applied in a targeted area for determining the pipe burst probability (Prob(PB)), the impact of pipe burst (Imp(PB)), and the WSR calculated as the product of these two values. Imp(PB) was separately calculated for the leakage duration time and the repair work time when water service is cut-off or reduced. The WSR for the block in the study area was calculated at 1.507 m(3)/year. To verify this WSR, pipe replacement was performed based on Prob(PB), which is a management indicator for the water provider, Imp(PB), which is a management indicator for the water consumer, and the WSR that considers both of these, by analyzing the WSR reduction effect of each. The pipe replacement cost, which is a restrictive condition, was set at 5% of the full replacement cost (5.3 billion won) for the entire pipe network in the targeted area. Pipe replacement was performed based on Prob(PB), Imp(PB) and WSR. The block WSR reduction efficiency for pipe replacement was calculated at 0.524 m(3)/year/billion won based solely on Prob(PB), 2.163 m(3)/year/billion won based solely on Imp(PB), and 2.173 m(3)/year/billion won based on concurrent consideration of both factors by introducing the concept of WSR. Hence, the reduction efficiency was the highest for pipe replacement based on WSR. The study results demonstrated the capability of the proposed WSR assessment model to concurrently consider the positions of both water provider and water consumer. In addition, the cost effectiveness of the model was verified.
引用
收藏
页码:1410 / 1420
页数:11
相关论文
共 50 条
  • [1] Optimal design of a new water distribution network using a water supply risk assessment
    Choi, Taeho
    Bae, Cheolho
    Shin, Hwisu
    Koo, Jayong
    [J]. DESALINATION AND WATER TREATMENT, 2017, 65 : 153 - 162
  • [2] A study on the reconstruction model for minimizing water supply risk in existing water distribution network
    Choi, Taeho
    Choi, Dooyong
    Kim, Kibum
    Koo, Jayong
    [J]. DESALINATION AND WATER TREATMENT, 2019, 143 : 126 - 136
  • [3] Risk Assessment of Lack of Water Supply Using the Hydraulic Model of the Water Supply
    Boryczko, Krzysztof
    Piegdon, Izabela
    Szpak, Dawid
    Zywiec, Jakub
    [J]. RESOURCES-BASEL, 2021, 10 (05):
  • [4] Development of Multi-Hazard Risk Assessment Model for Agricultural Water Supply and Distribution Systems Using Bayesian Network
    Atiyeh Bozorgi
    Abbas Roozbahani
    Seied Mehdy Hashemy Shahdany
    Rouzbeh Abbassi
    [J]. Water Resources Management, 2021, 35 : 3139 - 3159
  • [5] Development of Multi-Hazard Risk Assessment Model for Agricultural Water Supply and Distribution Systems Using Bayesian Network
    Bozorgi, Atiyeh
    Roozbahani, Abbas
    Hashemy Shahdany, Seied Mehdy
    Abbassi, Rouzbeh
    [J]. Water Resources Management, 2021, 35 (10): : 3139 - 3159
  • [6] Development of Multi-Hazard Risk Assessment Model for Agricultural Water Supply and Distribution Systems Using Bayesian Network
    Bozorgi, Atiyeh
    Roozbahani, Abbas
    Shahdany, Seied Mehdy Hashemy
    Abbassi, Rouzbeh
    [J]. WATER RESOURCES MANAGEMENT, 2021, 35 (10) : 3139 - 3159
  • [7] Risk assessment study for water supply network using GIS
    Sargaonkar, Aabha
    Nema, Shweta
    Gupta, Apurba
    Sengupta, Achintyakumar
    [J]. JOURNAL OF WATER SUPPLY RESEARCH AND TECHNOLOGY-AQUA, 2010, 59 (05): : 355 - 360
  • [8] Stability Assessment of Water Introduced into the Water Supply Network
    Wolska, M.
    Molczan, M.
    [J]. OCHRONA SRODOWISKA, 2015, 37 (04): : 51 - 56
  • [9] Distribution Network Assessment using EPANET for Intermittent and Continuous Water Supply
    Sanjeeb Mohapatra
    Aabha Sargaonkar
    Pawan Kumar Labhasetwar
    [J]. Water Resources Management, 2014, 28 : 3745 - 3759
  • [10] Distribution Network Assessment using EPANET for Intermittent and Continuous Water Supply
    Mohapatra, Sanjeeb
    Sargaonkar, Aabha
    Labhasetwar, Pawan Kumar
    [J]. WATER RESOURCES MANAGEMENT, 2014, 28 (11) : 3745 - 3759