Analysis of the top coal stability of the large section open-off cut under the gob in thick seams slicing mining

被引:2
|
作者
Chai, Jing [1 ]
Liu, Yongliang [1 ]
Gao, Shigang [1 ,2 ]
Yang, Jianfeng [1 ]
Zhang, Dingding [1 ]
Du, Wengang [1 ]
Ma, Chenyang [1 ]
Han, Zhicheng [1 ]
机构
[1] Xian Univ Sci & Technol, Coll Energy Engn, Xian 710054, Peoples R China
[2] Shendong Coal Grp Corp Ltd, China Energy Grp, Shenmu 719315, Peoples R China
基金
中国国家自然科学基金;
关键词
SUPPORT; VALIDATION; ROADWAYS; DESIGN; SYSTEM; STRAIN;
D O I
10.1038/s41598-022-21066-x
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The reserved thickness of top coal has an important influence on the stability of a large section open-off cut under gob in the thick seams slicing mining. The destabilization extremum conditions of the open-off cut top coal were derived from by elastic-plastic theory, and the optical fibre sensing technology was utilized to monitor the top coal deformation law with different thicknesses (3, 3.5, and 4 m) in the physical similar simulation experiment in the paper. The results show that the top coal thickness is greater than 3.4 m without tension cracks. In the vertical direction, the top coal of the large open-off cut is divided into mining and excavation disturbance zones under the influence of the upper slice coal mining and the excavation disturbance. In the direction of the span of the top coal can be divided into the roof fall risk zone and the warning zone. The deformation changes from exponential to linear to logarithmic in the roof fall risk zone, and it changes from linear to logarithmic in the roof fall warning zone as the number of excavations increases. The sinking amount in the two zones is smaller as the thickness of the top coal becomes larger. It is comprehensively determined that the thickness of the top coal of open-off cut is set as 3.5 m, the stability is moderate, and the field application shows that the integrity of the top coal is good after support, and the maximum off-layer value is 6 mm, which can satisfy the production requirements.
引用
收藏
页数:14
相关论文
共 48 条
  • [1] Analysis of the top coal stability of the large section open-off cut under the gob in thick seams slicing mining
    Jing Chai
    Yongliang Liu
    Shigang Gao
    Jianfeng Yang
    Dingding Zhang
    Wengang Du
    Chenyang Ma
    Zhicheng Han
    Scientific Reports, 12
  • [3] Reasonable top coal thickness for large cross-section open-off cut in lower-layer mining
    Gao, Shigang
    Du, Wengang
    Liu, Yongliang
    Chai, Jing
    Gao, Dengyan
    Ma, Chenyang
    Chen, Jianhua
    FRONTIERS IN EARTH SCIENCE, 2023, 11
  • [4] Large Section Open-off Cut Supporting Technology of Fully Mechanized Caving Mining for Carboniferous Extra-Thick Coal Seam
    Huang, Qing-guo
    Gao, Feng
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 566 - 569
  • [5] Study on optimization of supporting technology for large cross-section open-off cut under contiguous gob
    Gao S.
    Chen S.
    Chai J.
    Yang Y.
    Du W.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2021, 49 (12): : 20 - 28
  • [6] Bumping risk analysis in large section open-off cut in different construction orders
    Zhang, Zhi-Zhen
    Gao, Feng
    Gao, Ya-Nan
    Yan, Bin
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2010, 27 (02): : 264 - 268
  • [7] Design of Support Parameters of Large-Section Open-Off Cut and Its Dynamic Mining Response Characteristics
    Sun, Jian
    Yang, Yong
    Zhao, Yongjie
    Chen, Shengquan
    Hu, Dongsheng
    SHOCK AND VIBRATION, 2024, 2024 (01)
  • [8] Study on Active Support Parameters for Surrounding Rock with Ultra-Large Span Open-Off Cut in Thick Coal Seam
    Pu, Lin
    Liu, Yingjie
    Cai, Yongbo
    Sun, Zuo
    Zhou, Xin
    APPLIED SCIENCES-BASEL, 2023, 13 (23):
  • [9] Analysis of excavation method of large span open-off cut in deep mine
    Kan, Jia-Guang
    Zhang, Nong
    Li, Gui-Chen
    Wang, Cheng
    Zhang, Dong-Hua
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2009, 26 (02): : 163 - 167
  • [10] Principal stress difference transfer law and support in large-section open-off cut
    He Fu-lian
    Wang Xiao-ming
    Xu lei
    Wu Huan-kai
    Wang Jun
    ROCK AND SOIL MECHANICS, 2014, 35 (06) : 1703 - 1710