Warranty cost improvement of machine tools during the bidding process and operation

被引:0
|
作者
Lanza, Gisela [1 ]
Werner, Patrick [1 ]
Behmann, Benjamin [1 ]
Appel, Dominic [1 ]
机构
[1] Karlsruhe Inst Technol, Wbk Inst Prod Sci, D-76131 Karlsruhe, Germany
关键词
Reliability Improvement Warranties; Warranty costs prognosis;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages
    Guchhait, Rekha
    Dey, Bikash Koli
    Bhuniya, Shaktipada
    Ganguly, Baisakhi
    Mandal, Buddhadev
    Bachar, Raj Kumar
    Sarkar, Biswajit
    Wee, Huiming
    Chaudhuri, Kripasindhu
    [J]. RAIRO-OPERATIONS RESEARCH, 2020, 54 (01) : 251 - 266
  • [2] Warranty cost analysis with an alternating geometric process
    Arnold, Richard
    Chukova, Stefanka
    Hayakawa, Yu
    Marshall, Sarah
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2019, 233 (04) : 698 - 715
  • [3] Changeover process improvement based on modified SMED method and other process improvement tools application: an improvement project of 5-axis CNC machine operation in advanced composite manufacturing industry
    Ahmad, Rosmaini
    Soberi, Mohd Syazwan Faiz
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 94 (1-4): : 433 - 450
  • [4] Changeover process improvement based on modified SMED method and other process improvement tools application: an improvement project of 5-axis CNC machine operation in advanced composite manufacturing industry
    Rosmaini Ahmad
    Mohd Syazwan Faiz Soberi
    [J]. The International Journal of Advanced Manufacturing Technology, 2018, 94 : 433 - 450
  • [5] Energy-efficient manufacturing on machine tools by machining process improvement
    Fujishima, Makoto
    Mori, Masahiko
    Oda, Yohei
    [J]. PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2014, 8 (1-2): : 217 - 224
  • [6] Improvement of the machine tools performance
    Doina, Marin
    [J]. WSEAS Transactions on Systems and Control, 2010, 5 (03): : 184 - 194
  • [7] Improvement of the Efficiency of Machine Tools due to Coherent Operation of the Source and Consumer of Mechanical Power
    Egorov, A. V.
    Shram, V. G.
    Kaizer, Yu. F.
    Lysyannikov, A. V.
    Bezborodov, Yu. N.
    Stepanova, K. S.
    Kuznetsov, A. V.
    Tyukanov, V. L.
    [J]. JOURNAL OF MACHINERY MANUFACTURE AND RELIABILITY, 2023, 52 (01) : 88 - 91
  • [8] Improvement of the Efficiency of Machine Tools due to Coherent Operation of the Source and Consumer of Mechanical Power
    A. V. Egorov
    V. G. Shram
    Yu. F. Kaizer
    A. V. Lysyannikov
    Yu. N. Bezborodov
    K. S. Stepanova
    A. V. Kuznetsov
    V. L. Tyukanov
    [J]. Journal of Machinery Manufacture and Reliability, 2023, 52 : 88 - 91
  • [9] Process analysis tools for process improvement
    Bal, Jay
    [J]. TQM Magazine, 1998, 10 (05): : 342 - 354
  • [10] Warranty cost analysis of prorata policy for continuous sales process considering warranty execution factors
    Liu, ZJ
    Huang, HZ
    Xie, M
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON QUALITY & RELIABILITY, 2005, : 231 - 237