Probabilistic Reliability Assessment of North American Electric Power Systems

被引:0
|
作者
Bagen, B. [1 ]
Moura, J. [2 ]
Jefferies, K. [3 ]
机构
[1] Manitoba Hydro, Winnipeg, MB, Canada
[2] NERC, Washington, DC USA
[3] Ontario Power Generat, Ottawa, ON, Canada
关键词
EUE; LOLH; LTRA; NERC and ProbA;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper summarizes the results of the first mandatory NERC wide probabilistic reliability assessment that was completed in 2012. The main purpose of the assessment is to complement NERC's 2012 long-term reliability assessment (LTRA) by providing additional probabilistic metrics such as the expected unserved energy (EUE) and the loss of load expectation expressed in terms of hours per year (LOLH). The reliability of 26 assessment areas was examined in 11 individual evaluations which varied in scope from large interconnected systems such as the Western Electricity Coordinating Council (WECC) to relatively smaller systems for example Manitoba Hydro. These individual assessments were then combined into NERC's 2012 ProbA for the entire NERC footprint. The reliability indices for the third (2014) and the fifth (2016) years from the 2012 LTRA were calculated and reported for each assessment area. The assumptions, methodologies and models used in the 2012 ProbA are briefly described. Suggestions are also made for the improvement in the future NERC wide probabilistic reliability assessment.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Probabilistic reliability evaluation for interconnecting the power systems in north east Asia
    Choi, J. S.
    Tran, T.
    Kwon, J. J.
    Park, D. W.
    Yoon, J. Y.
    Moon, S. I.
    Cha, J. M.
    Billinton, R.
    [J]. 2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 4305 - +
  • [2] Improving Methods for Reliability Assessment of Electric Power Systems
    Pinchukov, Pavel
    Makasheva, Svetlana
    [J]. INTERNATIONAL SCIENTIFIC CONFERENCE ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT, EMMFT 2017, 2018, 692 : 162 - 169
  • [3] Reliability worth assessment in electric power delivery systems
    Chowdhury, AA
    Mielnik, TC
    Lawton, LE
    Sullivan, M
    Katz, A
    [J]. 2004 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1 AND 2, 2004, : 654 - 660
  • [4] A Probabilistic Framework for Seismic Risk Assessment of Electric Power Systems
    Salman, Abdullahi M.
    Li, Yue
    [J]. X INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS (EURODYN 2017), 2017, 199 : 1187 - 1192
  • [5] Probabilistic Approach to Reliability Assessment of Electric Power System Containing Distributed Generation
    Xu, Shengyou
    Chen, Minyou
    Ran, Li
    [J]. INTERNATIONAL REVIEW OF ELECTRICAL ENGINEERING-IREE, 2012, 7 (01): : 3478 - 3485
  • [6] A model for the seismic reliability assessment of electric power transmission systems
    Ang, AHS
    Pires, JA
    Villaverde, R
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 1996, 51 (01) : 7 - 22
  • [7] Quantitative reliability assessment of electric power systems in developing countries
    Billinton, R
    Pandey, M
    [J]. 1996 CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING - CONFERENCE PROCEEDINGS, VOLS I AND II: THEME - GLIMPSE INTO THE 21ST CENTURY, 1996, : 412 - 415
  • [8] A Reliability Assessment Approach for Electric Power Systems Considering Wind Power Uncertainty
    Yang, Xiyun
    Yang, Yuwei
    Liu, Yuqi
    Deng, Ziqi
    [J]. IEEE ACCESS, 2020, 8 : 12467 - 12478
  • [9] Probabilistic assessment of power systems
    Allan, R
    Billinton, R
    [J]. PROCEEDINGS OF THE IEEE, 2000, 88 (02) : 140 - 162
  • [10] A probabilistic life model for reliability analysis of power cables feeding electric traction systems
    Mazzanti, G.
    Passarelli, G.
    [J]. 2006 INTERNATIONAL SYMPOSIUM ON POWER ELECTRONICS, ELECTRICAL DRIVES, AUTOMATION AND MOTION, VOLS 1-3, 2006, : 834 - +