Problem Reduction Approaches for Production Planning Using Clearing Functions

被引:0
|
作者
Kacar, N. Baris [1 ]
Moench, Lars [2 ]
Uzsoy, Reha [1 ]
机构
[1] North Carolina State Univ, Edward P Fitts Dept Ind & Syst Engn, Raleigh, NC 27695 USA
[2] Univ Hagen, Dept Math & Comp Sci, D-58097 Hagen, Germany
关键词
BOTTLENECK DETECTION; SIMULATION;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A limitation of many mathematical programming models for production planning is their inability to reflect the nonlinear relation between workload and cycle times. Nonlinear clearing functions (CFs) explicitly model this relationship, and have shown promise for developing effective formulations. However, the use of CFs results in much larger models, and the effort involved in estimating the CFs is also significant. This paper examines the performance of reduced models where only a subset of potentially critical workcenters is represented with CFs. We find that even when the workcenters considered involve 75% of the average work in progress (WIP) in the system, the reduced models result in substantially lower performance than the full model where CFs are fitted to all workcenters. These results suggest that interactions between workcenters are quite complex and that models focusing on a limited set of machines may give misleading estimates of system performance. We provide insight into the causes of this behavior by analyzing the dual variables associated with the workcenters.
引用
收藏
页码:931 / 938
页数:8
相关论文
共 50 条
  • [1] A problem reduction approach for production planning using clearing functions
    Kacar, N. Baris
    Moench, Lars
    Uzsoy, Reha
    [J]. AT-AUTOMATISIERUNGSTECHNIK, 2019, 67 (06) : 455 - 467
  • [2] Conic programming models for production planning with clearing functions: Formulations and duality
    Gopalswamy, Karthick
    Uzsoy, Reha
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 292 (03) : 953 - 966
  • [3] An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms
    Kacar, Necip Baris
    Irdem, Durmus Fatih
    Uzsoy, Reha
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2012, 25 (01) : 104 - 117
  • [4] Optimal Control Approaches to the Aggregate Production Planning Problem
    Davizon, Yasser A.
    Martinez-Olvera, Cesar
    Soto, Rogelio
    Hinojosa, Carlos
    Espino-Roman, Piero
    [J]. SUSTAINABILITY, 2015, 7 (12) : 16324 - 16339
  • [5] Estimating Clearing Functions for Production Resources Using Simulation Optimization
    Kacar, Necip Baris
    Uzsoy, Reha
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (02) : 539 - 552
  • [6] Planning Wafer Starts using Nonlinear Clearing Functions: A Large-Scale Experiment
    Kacar, Necip Baris
    Moench, Lars
    Uzsoy, Reha
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2013, 26 (04) : 602 - 612
  • [7] Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept
    Missbauer, Hubert
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 131 (01) : 399 - 406
  • [8] SIMULATION BASED CLEARING FUNCTIONS FOR A MODEL OF ORDER RELEASE PLANNING
    Lange, Frederick
    Herrmann, Frank
    Claus, Thorsten
    [J]. PROCEEDINGS 27TH EUROPEAN CONFERENCE ON MODELLING AND SIMULATION ECMS 2013, 2013, : 741 - +
  • [9] An integrated strategy for a production planning and warehouse layout problem: Modeling and solution approaches
    Zhang, Guoqing
    Nishi, Tatsushi
    Turner, Sarina D. O.
    Oga, Keisuke
    Li, Xindan
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 68 : 85 - 94
  • [10] Using Penalty in Mathematical Decomposition for Production-Planning to Accommodate Clearing Function Constraints of Capacity
    de Sampaio, Raimundo J. B.
    Wollmann, Rafael R. G.
    Yuan, Jin Yun
    Favaretto, Fabio
    [J]. OPTIMIZATION AND CONTROL TECHNIQUES AND APPLICATIONS, 2014, 86 : 137 - 149