Back Charges in Construction Contract: Case Study of Airport Project

被引:1
|
作者
Kisi, Krishna P. [1 ]
Kayastha, Rujan [2 ]
Shrestha, Pramen P. [3 ]
机构
[1] Texas State Univ, Dept Engn Technol, 601 Univ Dr, San Marcos, TX 78666 USA
[2] GreenTech Engn & Builders Pvt Ltd, Ward 2, Bhaktapur 44800, Nepal
[3] Univ Nevada, Dept Civil & Environm Engn & Construct, 4505 S Maryland Pkwy, Las Vegas, NV 89154 USA
关键词
Construction contracts; Prime contractor; Subcontractor; Back charge; Contract clause;
D O I
10.1061/(ASCE)LA.1943-4170.0000392
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
One of the problems causing subcontractors to have back charges is the lack of contract clauses in the subcontract document to prevent from back charging. This paper identifies the items that are frequently back charged and determines the primary reasons for subcontractor back charges during the construction of the passenger terminal complex of the international airport project. The authors collected 16 items that were back charged, worth USD 658,000. The authors collected and analyzed contract documents, site reports, emails, meeting minutes, and photos to investigate the back charge claims of the prime contractor to the subcontractor. From this case study, the authors found the primary reasons for back charges were a frequent change of construction managers, subcontractor's lack of knowledge about the contract clauses, lack of proper documentation, and late notice of back charges made to the subcontractor. The analysis and study findings can help subcontractors to understand the potential sources of back charges, identify contract clauses in overcoming back charges, be aware of the possible abuse of back charges, and make more informed decisions before signing a subcontract document. (c) 2020 American Society of Civil Engineers.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Incorporating Project Complexities in Risk Assessment: Case of an Airport Expansion Construction Project
    Andringa, Lise
    Okmen, Onder
    Leijten, Martijn
    Bosch-Rekveldt, Marian
    Bakker, Hans
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (06)
  • [2] The Study on Law Disputes in Construction Project Contract Relationship
    Yang, Zhang
    [J]. 2012 INTERNATIONAL CONFERENCE ON MEDICAL PHYSICS AND BIOMEDICAL ENGINEERING (ICMPBE2012), 2012, 33 : 1999 - 2004
  • [3] Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project
    Koseoglu, Ozan
    Nurtan-Gunes, Elif Tugce
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (10) : 1298 - 1321
  • [4] Cognition and decision making in construction engineering and management: A case of construction project contract negotiation
    Xue, Xiaolong
    Shen, Qiping
    Ren, Zhaomin
    Ni, Jiqi
    [J]. Journal of Convergence Information Technology, 2011, 6 (03) : 226 - 233
  • [5] The Impact of Project Complexity on Construction Contract Incompleteness: An Empirical Study
    Luo, Yazhuo
    [J]. PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 343 - 346
  • [6] Claims in International Construction Contract: A Case Study
    刘义
    [J]. 海外英语, 2011, (02) : 264 - 271
  • [7] Case studies of lightweight treated soil method in seaport and airport construction project
    Tsuchida, T
    Kang, MS
    [J]. PROCEEDINGS OF THE TWELFTH ASIAN REGIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1 AND 2, 2003, : 249 - 252
  • [8] The Study of Construction Claims for International Project under FIDIC Conditions of Contract
    焦清杰
    [J]. 海外英语, 2012, (15) : 281 - 283
  • [9] Study on Construction Claim for International Project Based on Contract Status Analysis
    Zhou Yihong
    Tan Wei
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3356 - 3359
  • [10] Cognitive Analysis on the Construction Project Contract Negotiation
    Ni Jiqi
    Xue Xiaolong
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 69 - 72