A simulated annealing approach to mine production scheduling

被引:51
|
作者
Kumral, M [1 ]
Dowd, PA
机构
[1] Inonu Univ, Sch Engn, TR-44082 Malatya, Turkey
[2] Univ Leeds, Leeds LS2 9JT, W Yorkshire, England
关键词
simulated annealing; scheduling/sequencing; mine production;
D O I
10.1057/palgrave.jors.2601902
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Increasing global competition, quality standards, environmental awareness and decreasing ore prices impose new challenges to mineral industries. Therefore, the extraction of mineral resources requires careful design and scheduling. In this research, simulated annealing ( SA) is recommended to solve a mine production scheduling problem. First of all, in situ mineral characteristics of a deposit are simulated by sequential Gaussian simulation, and averaging the simulated characteristics within specified block volumes creates a three-dimensional block model. This model is used to determine optimal pit limits. A linear programming ( LP) scheme is used to identify all blocks that can be included in the blend without violating the content requirements. The Lerchs-Grosmann algorithm using the blocks identified by the LP program determines optimal pit limits. All blocks that lie outside of the optimal pit limit are removed from the system and the blocks within the optimal pit are submitted to the production scheduling algorithm. Production scheduling optimization is carried out in two stages: Lagrangean parameterization, resulting in an initial sub-optimal solution, and multi-objective SA, improving the sub-optimal schedule further. The approach is demonstrated on a Western Australian iron ore body.
引用
收藏
页码:922 / 930
页数:9
相关论文
共 50 条
  • [1] A simulated annealing based approach for open pit mine production scheduling with stockpiling option
    Danish, Abid Ali Khan
    Khan, Asif
    Muhammad, Khan
    Ahmad, Waqas
    Salman, Saad
    RESOURCES POLICY, 2021, 71
  • [2] A simulated annealing approach to integrated production scheduling
    Palmer, GJ
    JOURNAL OF INTELLIGENT MANUFACTURING, 1996, 7 (03) : 163 - 176
  • [3] Fleet scheduling optimization: A simulated annealing approach
    Sosnowska, D
    Rolim, J
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 227 - 241
  • [4] A SIMULATED ANNEALING APPROACH TO SCHEDULING A MANUFACTURING CELL
    VAKHARIA, AJ
    CHANG, YL
    NAVAL RESEARCH LOGISTICS, 1990, 37 (04) : 559 - 577
  • [5] SCHEDULING IN A CELLULAR MANUFACTURING SYSTEM - A SIMULATED ANNEALING APPROACH
    SRIDHAR, J
    RAJENDRAN, C
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (12) : 2927 - 2945
  • [6] HARVEST SCHEDULING WITH SPATIAL CONSTRAINTS - A SIMULATED ANNEALING APPROACH
    LOCKWOOD, C
    MOORE, T
    CANADIAN JOURNAL OF FOREST RESEARCH-REVUE CANADIENNE DE RECHERCHE FORESTIERE, 1993, 23 (03): : 468 - 478
  • [7] Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing
    Kumral, M
    Dowd, PA
    APPLICATION OF COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, PROCEEDINGS, 2002, : 731 - 741
  • [8] Main transformer ULTC and capacitors scheduling by simulated annealing approach
    Liang, RH
    Wang, YS
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2001, 23 (07) : 531 - 538
  • [9] A SIMULATED ANNEALING APPROACH TO THE CYCLIC STAFF-SCHEDULING PROBLEM
    BRUSCO, MJ
    JACOBS, LW
    NAVAL RESEARCH LOGISTICS, 1993, 40 (01) : 69 - 84
  • [10] A SIMULATED ANNEALING APPROACH TO THE SOLUTION OF FLEXIBLE LABOR SCHEDULING PROBLEMS
    BRUSCO, MJ
    JACOBS, LW
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1191 - 1200