Quality of the guidelines for preparation and review of environmental impact assessment reports in Pakistan

被引:7
|
作者
Hameed, Rizwan [1 ]
Nadeem, Obaidullah [1 ]
机构
[1] Univ Engn & Technol, Dept City & Reg Planning, Lahore, Pakistan
关键词
EIA guidelines; report quality; review criteria; consultants' views; Pakistan; ASSESSMENT SYSTEM; EIA; INDIA;
D O I
10.1080/14615517.2018.1529947
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Environmental impact assessment (EIA) is an important tool for making informed decisions about development projects to avoid or mitigate potential adverse impacts on the environment. Guidelines are prepared all over the world to facilitate consultants and stakeholders to meet the objectives of EIA and to prepare quality EIA reports. The Pakistan Environmental Protection Agency prepared environmental impact assessment guidelines for this purpose in 1997. However, the major issue is that, even after two decades, the guidelines have not been reviewed. This paper presents the outcome of research conducted on the contents and quality of the guidelines for the preparation of EIA reports. The methodology encompasses an extensive review of the literature as well as available guidelines and interviews with the selected consultants, using semi-structured interview schedules. Although the quality of current guidelines overall is found to be good, the likelihood they are followed is connected with them being updated regularly, taking on board opinion of EIA consultants and other stakeholders.
引用
收藏
页码:139 / 149
页数:11
相关论文
共 50 条
  • [1] A review of the status of environmental impact assessment in Pakistan
    Ehtasham, Laraib
    Sherani, Sadia H.
    Younas, Kiran
    Izbel, Umama
    Khan, Amna H.
    Bahadur, Anila
    Akbar, Ali
    [J]. INTEGRATED ENVIRONMENTAL ASSESSMENT AND MANAGEMENT, 2022, 18 (02) : 314 - 318
  • [2] A review of the quality of strategic environmental assessment (SEA) reports in Botswana
    Matome, Gorata Kingsley
    Mulale, Kutlwano
    [J]. IMPACT ASSESSMENT AND PROJECT APPRAISAL, 2023, 41 (05) : 403 - 415
  • [3] Assessing the existing guidelines of environmental impact assessment and mitigation measures for future hydropower projects in Pakistan
    Butt, Asim Qayyum
    Shangguan, Donghui
    Ding, Yongjian
    Banerjee, Abhishek
    Sajjad, Wasim
    Mukhtar, Muhammad Ahsan
    [J]. FRONTIERS IN ENVIRONMENTAL SCIENCE, 2024, 11
  • [4] Evaluation of environmental impact assessment system in Pakistan
    Nadeem, Obaidullah
    Hameed, Rizwan
    [J]. ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2008, 28 (08) : 562 - 571
  • [5] Evaluation of Environmental Impact Assessment legislation in Pakistan
    Khan, Mehreen
    Chaudhry, M. N.
    [J]. IMPACT ASSESSMENT AND PROJECT APPRAISAL, 2024, 42 (02) : 123 - 140
  • [6] Land use change in Kelantan: Review of the Environmental Impact Assessment (EIA) reports
    Samsurijan, Mohamad Shaharudin
    Abd Rahman, Nik Norulaini
    Ishak, Muhammad Izzuddin Syakir
    Masron, Tajul Ariffin
    Kadir, Omar
    [J]. GEOGRAFIA-MALAYSIAN JOURNAL OF SOCIETY & SPACE, 2018, 14 (04): : 322 - 331
  • [7] An Assessment of Environmental Impact on Agriculture in the Indus Delta Pakistan
    Mahar, Gohar Ali
    Zaigham, Nayyer Alam
    [J]. EXPLORING THE NEXUS OF GEOECOLOGY, GEOGRAPHY, GEOARCHEOLOGY AND GEOTOURISM: ADVANCES AND APPLICATIONS FOR SUSTAINABLE DEVELOPMENT IN ENVIRONMENTAL SCIENCES AND AGROFORESTRY RESEARCH, 2019, : 27 - 32
  • [8] Role of and challenges to environmental impact assessment proponents in Pakistan
    Khan, Mehreen
    Chaudhry, Muhammad Nawaz
    [J]. Environmental Impact Assessment Review, 2021, 90
  • [9] Environmental impact assessment of barrages in Sindh Province, Pakistan
    Ahmed, R
    [J]. BARRAGES: ENGINEERING DESIGN & ENVIRONMENTAL IMPACTS, 1996, : 431 - 440
  • [10] Role of and challenges to environmental impact assessment proponents in Pakistan
    Khan, Mehreen
    Chaudhry, Muhammad Nawaz
    [J]. ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2021, 90