A Mathematical Model for Forecasting the Dam-Break Flood Routing Process of a Landslide Dam

被引:12
|
作者
Xu, Fugang [1 ]
Zhou, Hongwei [1 ]
Zhou, Jiawen [1 ,2 ]
Yang, Xingguo [1 ]
机构
[1] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Peoples R China
[2] Chinese Acad Sci, Key Lab Mt Hazards & Earth Surface Proc, Chengdu 610044, Peoples R China
基金
中国国家自然科学基金;
关键词
FAILURE;
D O I
10.1155/2012/139642
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Once a landslide dam bursts, its reservoir discharges quickly in a flood which will cause catastrophic damage to life and property downstream. For a specific landslide dam, the peak flow rate and the evolution of downstream flood are influenced by the shape and size of the dike breach when dam-break occurs. According to the general nature of landslide dams and field observations of dike-breach development patterns, a dike-breach propagation mode has been determined. By combining an improved empirical equation with knowledge of the dike-breach propagation mode, a mathematical model for forecasting dam-break flood routing has been developed and is presented here. Sensitivity analysis was then carried out based on the computed results for peak flow rate and the flood evolution curve under different parameters. The computed results showed that the width coefficient and the depth coefficient had similar effects on the dam-break flood but that the impact of the depth coefficient was more significant than that of the width coefficient. Finally, the proposed model was used to calculate the flood evolution for the Tangjiashan landslide dam. The computed results showed that the error between the simulated result and the measured data was less than 5%.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] LABORATORY VERIFICATION OF A DAM-BREAK FLOOD MODEL
    CHEN, C
    [J]. JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1980, 106 (04): : 535 - 556
  • [2] Landslide dam and subsequent dam-break flood estimation using HEC-RAS model in Northern Pakistan
    Mohsin Jamil Butt
    Muhammad Umar
    Raheel Qamar
    [J]. Natural Hazards, 2013, 65 : 241 - 254
  • [3] Landslide dam and subsequent dam-break flood estimation using HEC-RAS model in Northern Pakistan
    Butt, Mohsin Jamil
    Umar, Muhammad
    Qamar, Raheel
    [J]. NATURAL HAZARDS, 2013, 65 (01) : 241 - 254
  • [4] LABORATORY VERIFICATION OF A DAM-BREAK FLOOD MODEL - DISCUSSION
    KATOPODES, ND
    SCHAMBER, DR
    [J]. JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1981, 107 (02): : 246 - 249
  • [5] LABORATORY VERIFICATION OF A DAM-BREAK FLOOD MODEL - CLOSURE
    CHEN, CL
    [J]. JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1982, 108 (02): : 275 - 283
  • [6] Analysis and Research on Risks of Dam-break Flood of Arch Dam
    Wang, Xiaohang
    Zhang, Shichen
    Zhou, Kefa
    Qiu, Cunyuan
    Yang, Xiaowei
    [J]. PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ARCHITECTURAL ENGINEERING AND CIVIL ENGINEERING, 2016, 72 : 460 - 464
  • [7] A Virtual Geographic Environment for Simulation Analysis of Dam-break Flood Routing
    Zhu, Jun
    Li, Yi
    Hu, Ya
    [J]. ADVANCED MATERIALS RESEARCH II, PTS 1 AND 2, 2012, 463-464 : 926 - +
  • [8] MATHEMATICAL SIMULATION OF DAM-BREAK FLOW
    RAJAR, R
    [J]. JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1980, 106 (03): : 453 - 454
  • [9] MATHEMATICAL SIMULATION OF DAM-BREAK FLOW
    RAJAR, R
    [J]. JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1978, 104 (07): : 1011 - 1026
  • [10] MATHEMATICAL SIMULATIONS OF THE TOCCOA-FALLS, GEORGIA, DAM-BREAK FLOOD
    LAND, LF
    [J]. WATER RESOURCES BULLETIN, 1980, 16 (06): : 1041 - 1048