共 50 条
- [2] Research on accommodation scheme of curtailed wind power based on peak-shaving electric boiler in secondary heat supply network [J]. Dianwang Jishu, 11 (3286-3291): : 3286 - 3291
- [3] A Curtailed Wind Power Accommodation Strategy Based On Wind-Hydrogen-Heat-Storage Integrated Fnergy Network [J]. 2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 6146 - 6150
- [4] Analysis on mechanism of curtailed wind power accommodation and its economic operation based on electric boiler for peak-load regulation at secondary heat supply network [J]. Hu, Linxian (linxian_hu@163.com), 2016, Automation of Electric Power Systems Press (40):
- [8] Wind power accommodation strategy and benefit analysis of combined heating of electric and coal boilers [J]. Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2019, 40 (04): : 986 - 994
- [9] Computer simulation of the operating conditions of the steam boilers and heat-supply system of cogeneration power station TETs-26 [J]. Thermal Engineering (English translation of Teploenergetika), 43 (06):
- [10] Wind Power Accommodation by CHP Based on Electric Boiler and Heat Accumulator [J]. PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ENERGY, POWER AND ELECTRICAL ENGINEERING, 2016, 56 : 10 - 13