Barriers to planning and implementing Bus Rapid Transit systems

被引:47
|
作者
Lindau, Luis Antonio [1 ,2 ]
Hidalgo, Dario [3 ]
de Almeida Lobo, Adriana [4 ]
机构
[1] EMBARQ Brasil, Brasilia, DF, Brazil
[2] Univ Fed Rio Grande do Sul, Lab Sistemas Transportes, BR-90046900 Porto Alegre, RS, Brazil
[3] EMBARQ, Washington, DC USA
[4] EMBARQ Mexico, Ciudad De Mexico, DF, Mexico
关键词
Bus Rapid Transit; Mass transit; Busways; Bus priority systems; IMPACT;
D O I
10.1016/j.retrec.2014.09.026
中图分类号
F [经济];
学科分类号
02 ;
摘要
Bus Rapid Transit, BRT, is now operating in many cities of emerging and developed economies around the world. It provides affordable connectivity, and fast and reliable services for a range of requirements. This paper presents barriers to introducing BRT based on the authors' experience in planning, implementing and improving these systems in cities of emerging countries. We conclude that most issues are related to institutional, financial, legal and political sectors. In particular, BRT planning faces: (i) institutional complexities and lack of technical capacity; (ii) lack of alignment among stakeholders; (iii) strong promotion of competing modes; (iv) perception of BRT as a lower quality mode; (v) traditional bias towards vehicle capacity expansions; (vi) opposition from existing bus operators; and (vii) lack of community participation. BRT implementation barriers include: (i) underestimating the implementation effort, i.e. optimism bias; (ii) discontinuities due to political cycles; (iii) lack of national policies supporting BRT development; (iv) insufficient funding for adequate implementation; and (v) rushed inauguration. By addressing and documenting common issues of many real world experiences, we expect to help cities enhance their ability to advance BRT as part of their portfolio of sustainable mobility improvements. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:9 / 15
页数:7
相关论文
共 50 条
  • [1] Framework for deployment planning of bus rapid transit systems
    Yin, YF
    Miller, MA
    Ceder, A
    [J]. TRANSIT: BUS, RURAL PUBLIC AND INTERCITY, AND PARATRANSIT, 2005, (1903): : 11 - 19
  • [2] Planning for Bus Rapid Transit in an island context. The challenges of implementing BRT in Malta
    Attard, Maria
    [J]. RESEARCH IN TRANSPORTATION ECONOMICS, 2023, 100
  • [3] Planning for Bus Rapid Transit in Single Dedicated Bus Lane
    Li, Jing-Quan
    Song, Myoung Kyun
    Li, Meng
    Zhang, Wei-Bin
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2111) : 76 - 82
  • [4] Bus Rapid Transit Systems: A Viable Transit Solution
    Guckert, Wes
    [J]. ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 2015, 85 (11): : 38 - 41
  • [5] Implementing bus rapid transit: A tale of two Indian cities
    Rizvi, Andrea
    Sclar, Elliott
    [J]. RESEARCH IN TRANSPORTATION ECONOMICS, 2014, 48 : 194 - 204
  • [6] Implementing Houston's First Bus Rapid Transit System
    Gunda, Ramesh
    Atluri, Mohan P.
    [J]. ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 2017, 87 (04): : 34 - 38
  • [7] PLANNING RAPID TRANSIT SYSTEMS
    DOUGHERTY, WL
    [J]. UNDERGROUND SPACE, 1982, 6 (06): : 331 - 336
  • [8] Transit Signal Priority Architecture for Bus Rapid Transit Systems
    Gomez-Londono, Rene
    Velasquez-Gomez, Andres G.
    Munoz-Tobon, Fabian L.
    [J]. 2014 9TH COMPUTING COLOMBIAN CONFERENCE (9CCC), 2014, : 62 - 67
  • [9] Bus rapid transit systems: a comparative assessment
    Hensher, David A.
    Golob, Thomas F.
    [J]. TRANSPORTATION, 2008, 35 (04) : 501 - 518
  • [10] Bus rapid transit systems: a comparative assessment
    David A. Hensher
    Thomas F. Golob
    [J]. Transportation, 2008, 35 : 501 - 518