Two-Stage Optimization Model for Two-Side Daily Reserve Capacity of a Power System Considering Demand Response and Wind Power Consumption

被引:7
|
作者
Dong, Jun [1 ]
Fu, Anyuan [1 ]
Liu, Yao [1 ]
Nie, Shilin [1 ]
Yang, Peiwen [1 ]
Nie, Linpeng [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
关键词
two-stage stochastic programming; two-side reserve capacity mechanism; wind power; K-means-NWP; scheduling model; OPTIMAL JOINT ENERGY; STORAGE; PARTICIPATION; DISPATCH; HYDRO; GAS;
D O I
10.3390/su11247171
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Today, wind power is becoming an important energy source for the future development of electric energy due to its clean and environmentally friendly characteristics. However, due to the uncertainty of incoming wind, the utilization efficiency of wind energy is extremely low, which means the problem of wind curtailment becomes more and more serious. To solve the issue of wind power large-scale consumption, a two-stage stochastic optimization model is established in this paper. Different from other research frameworks, a novel two-side reserve capacity mechanism, which simultaneously takes into account supply side and demand side, is designed to ensure the stable consumption of wind power in the real-time market stage. Specifically, the reserve capacity of thermal power units is considered on the supply side, and the demand response is introduced as the reserve capacity on the demand side. At the same time, the compensation mechanism of reserve capacity is introduced to encourage generation companies (GENCOs) to actively participate in the power balance process of the real-time market. In terms of solution method, compared with the traditional k-means clustering method, this paper uses the K-means classification based on numerical weather prediction (K-means-NWP) scenario clustering method to better describe the fluctuation of wind power output. Finally, an example simulation is conducted to analyze the influence of reserve capacity compensation mechanism and system parameters on wind power consumption results. The results demonstrate that with the introduction of reserve capacity compensation mechanism, the wind curtailment quantity of the power system has a significant reduction. Besides, the income of GENCOs is gradually increasing, which motivates their enthusiasm to provide reserve capacity. Furthermore, the reserve capacity mechanism designed in this paper promotes the consumption of wind power and the sustainable development of renewable energy.
引用
收藏
页数:22
相关论文
共 50 条
  • [1] Two-stage flexible economic dispatch for power system considering wind power uncertainty and demand response
    Duan, Jiandong
    Liu, Fan
    Yang, Yao
    Jin, Zhuanting
    [J]. ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2022, 44 (01) : 650 - 668
  • [2] A two-stage scheduling optimization model and solution algorithm for wind power and energy storage system considering uncertainty and demand response
    Tan, Zhong-fu
    Ju, Li-wei
    Li, Huan-huan
    Li, Jia-yu
    Zhang, Hui-juan
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 63 : 1057 - 1069
  • [3] Robust Optimization of Multiple Reserve Resources Considering Reserve Capacity of Wind Power and Demand Response
    Chen, Zhe
    Wang, Luyu
    Guo, Chuangxin
    Ma, Guang
    Zhang, Jinjiang
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2020, 44 (10): : 50 - 58
  • [4] Two-stage Optimization of Load Restoration Considering Integration of Wind Power
    Qiu, Chenguang
    Cheng, Jinmin
    Liu, Zhihang
    Gao, Yunbo
    Zang, Haixiang
    [J]. PROCEEDINGS OF THE 2018 13TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2018), 2018, : 2642 - 2647
  • [5] Two-stage stochastic optimization of virtual power plant with wind power and uncertain demand
    Zhang, Ningwei
    Zhang, Yuli
    Cheng, Zihan
    Zhang, Lijun
    [J]. INTERNATIONAL JOURNAL OF GREEN ENERGY, 2024, 21 (13) : 3010 - 3022
  • [6] A Two-Stage Scheduling Optimization Model and Corresponding Solving Algorithm for Power Grid Containing Wind Farm and Energy Storage System Considering Demand Response
    Geng, Kun-long
    Ai, Xin
    Liu, Bin
    [J]. INTERNATIONAL CONFERENCE ON APPLIED MECHANICS AND MECHANICAL AUTOMATION (AMMA 2017), 2017, : 139 - 145
  • [7] A novel two-stage unit commitment model incorporating demand response for the integration of wind power
    Zhang, Ning
    Wang, Yiyi
    Yuan, Long
    Hu, Zhaoguang
    Qiao, Yanan
    [J]. 2017 FIRST IEEE INTERNATIONAL CONFERENCE ON ENERGY INTERNET (ICEI 2017), 2017, : 308 - 313
  • [8] Market-Based Two-Stage Stochastic Scheduling Programming Considering Demand Side Provider and Wind Power Penetration
    Pouladkhay, Mahrou
    Moghaddam, Maziar Mirhosseini
    Sahab, Alireza
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF ELECTRICAL ENGINEERING, 2023, 47 (04) : 1459 - 1472
  • [9] Market-Based Two-Stage Stochastic Scheduling Programming Considering Demand Side Provider and Wind Power Penetration
    Mahrou Pouladkhay
    Maziar Mirhosseini Moghaddam
    Alireza Sahab
    [J]. Iranian Journal of Science and Technology, Transactions of Electrical Engineering, 2023, 47 : 1459 - 1472
  • [10] Reserve Optimization for Power System Considering Reliability of Wind Power Reserve
    Wang, Zhixin
    Wang, Mingqiang
    Yang, Ming
    Wang, Mengxia
    Wang, Chengfu
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2023, 47 (15): : 142 - 150