Flood Season Staging and Adjustment of Limited Water Level for a Multi-Purpose Reservoir

被引:15
|
作者
Mo, Chongxun [1 ,2 ,3 ,4 ]
Deng, Juan [1 ,2 ,3 ,4 ]
Lei, Xingbi [1 ,2 ,3 ,4 ]
Ruan, Yuli [1 ,2 ,3 ,4 ]
Lai, Shufeng [1 ,2 ,3 ,4 ]
Sun, Guikai [1 ,2 ,3 ,4 ]
Xing, Zhenxiang [5 ]
机构
[1] Guangxi Univ, Coll Architecture & Civil Engn, Nanning 530004, Peoples R China
[2] Minist Educ, Key Lab Disaster Prevent & Struct Safety, Nanning 530004, Peoples R China
[3] Guangxi Key Labs Disaster Prevent & Engn Safety, Nanning 530004, Peoples R China
[4] Guangxi Univ, Guangxi Prov Engn Res Ctr Water Secur & Intellige, Nanning 530004, Peoples R China
[5] Northeast Agr Univ, Sch Water Conservancy & Civil Engn, Harbin 150006, Peoples R China
关键词
seasonality index; fractal method; flood period segmentation; FLWL; Longtan Reservoir; LOW IMPACT DEVELOPMENT; LAKE OUTBURST FLOODS; EXTRATROPICAL CYCLONES; NORTHEAST COAST; OPTIMAL-DESIGN; RISK; IMPLEMENTATION;
D O I
10.3390/w14050775
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A reasonable flood season delineation can effectively implement staged reservoir scheduling and improve water resource efficiency. Therefore, this study is aimed at analyzing the flood period segmentation and optimizing the staged flood limit water levels (FLWLs) for a multi-purpose reservoir, the Longtan Reservoir, China. The rainfall seasonality index (SIP) and the runoff seasonality index (SIR) are used to evaluate the feasibility and rationality of the flood period staging. The fractal method is then used to segment the flood season. Finally, the design flood is carried out to optimize the staged FLWLs. The results show that the SI is an effective indicator for judging the feasibility and verifying the rationality of flood segmentation. The flood period can be segmented into the pre-flood season (12 April-29 May), the main flood season (30 May-3 September), and the post-flood season (4 September-9 November). The FLWLs in the main flood and the post-flood season can be raised by 2.05 m and 3.45 m, and the effective reservoir capacity is increased by 5.810 billion m(3) and 6.337 billion m(3), according to the results of the flood season division.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Study on the Staged Operation of a Multi-Purpose Reservoir in Flood Season and Its Effect Evaluation
    Mo, Chongxun
    Zhu, Can
    Ruan, Yuli
    Lei, Xingbi
    Xing, Zhenxiang
    Sun, Guikai
    WATER, 2021, 13 (18)
  • [2] Combining water supply and flood mitigation requirements in multi-purpose reservoir optimization
    Frongia, S.
    Liberatore, S.
    Sechi, G. M.
    Sulis, A.
    Zucca, R.
    21ST INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION (MODSIM2015), 2015, : 2360 - 2366
  • [3] Adaptive Operating Rules for Flood Control of a Multi-Purpose Reservoir
    Drobot, Radu
    Draghia, Aurelian Florentin
    Dinu, Cristian
    Sirbu, Nicolai
    Chendes, Viorel
    Mazilu, Petrisor
    HYDROLOGY, 2024, 11 (09)
  • [4] Reservoir Flood Season Segmentation and Risk–benefit Cooperative Decision of Staged Flood Limited Water Level
    Xiaoying Li
    Yan Zhang
    Zechun Tong
    Guo-Yue Niu
    Water Resources Management, 2022, 36 : 3463 - 3479
  • [5] Dynamic operation rules of multi-purpose reservoir for better flood management
    Moussa, Ahmed Moustafa Ahmed
    ALEXANDRIA ENGINEERING JOURNAL, 2018, 57 (03) : 1665 - 1679
  • [6] Multi-purpose vranov nad dyjí water reservoir
    Oppeltová, Petra
    Ulrich, Ondrej
    Svobodová, Jana
    Public Recreation and Landscape Protection - With Sense Hand in Hand! Conference Proceedings, 2021, : 307 - 311
  • [7] The management of a multi-purpose reservoir
    Turgeon, A.
    MANAGEMENT OF NATURAL RESOURCES, SUSTAINABLE DEVELOPMENT AND ECOLOGICAL HAZARDS, 2007, 99 : 565 - 575
  • [8] Reservoir Flood Season Segmentation and Risk-benefit Cooperative Decision of Staged Flood Limited Water Level
    Li, Xiaoying
    Zhang, Yan
    Tong, Zechun
    Niu, Guo-Yue
    WATER RESOURCES MANAGEMENT, 2022, 36 (10) : 3463 - 3479
  • [9] Optimization of limited water level in flood season and impounding scheme for reservoir in Three Gorges Project
    Liu, Pan
    Guo, Sheng-Lian
    Wang, Cai-Jun
    Zhou, Fen
    Shuili Xuebao/Journal of Hydraulic Engineering, 2004, (07):
  • [10] Multi-purpose fuzzy decision making method in the selection of reservoir's normal water level
    Zhang, Yue
    Peng, Quangang
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 1999, 19 (12): : 99 - 107