Manufacturing and Operation of the Magnetic Septa for the Slow Beam Extraction From the J-PARC 50 GeV Proton Synchrotron

被引:4
|
作者
Muto, Ryotaro [1 ]
Arakaki, Yoshitugu [4 ]
Fan, Kuanjun [4 ]
Ishii, Koji [4 ]
Kiyomichi, Akio [1 ]
Kobayashi, Hitoshi [4 ]
Matsumoto, Hiroshi [4 ]
Murasugi, Shigeru [4 ]
Nakagawa, Hidetoshi [4 ]
Odagiri, Jun-ichi [4 ]
Okamura, Katsuya [4 ]
Sakai, Izumi [2 ]
Sato, Hikaru [3 ]
Sawada, Shin'ya [1 ]
Shirakabe, Yoshihisa [1 ]
Tanaka, Kazuhiro [1 ]
Tokumoto, Shuichi [4 ]
Tomizawa, Masahito [4 ]
Yanaoka, Eiichi [4 ]
机构
[1] High Energy Accelerator Res Org KEK, Inst Particle & Nucl Studies, Hadron Beam Channel Grp, Tsukuba, Ibaraki 3050801, Japan
[2] Univ Fukui, Fukui 9108507, Japan
[3] Tsukuba Univ Technol, Fac Ind Technol, Tsukuba, Ibaraki 3058520, Japan
[4] KEK, Accelerator Lab, Tokyo, Japan
关键词
Accelerator magnets; magnetic septa; particle beam extraction;
D O I
10.1109/TASC.2010.2040255
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The magnetic septa have been developed for the slow beam extraction from the 50 GeV Proton Synchrotron to the Hadron Experimental Hall at J-PARC (Japan Proton Accelerator Research Complex). The magnetic septa consist of two thin magnetic septa, four medium thick magnetic septa and four thick magnetic septa. The typical operating current is 3000 A and the total kick angle is 77 mrad with the 30 GeV proton beam. All parts of the thin and of the medium thick septum magnets are made of inorganic materials to resist high radiation environment. The positions of the thin and medium thick septa can be aligned remotely in the horizontal range of +/- 5 mm, which enables us to minimize the beam loss at the magnetic septum section. The septa were installed in the synchrotron ring in December, 2008, after a test at KEK (High Energy Accelerator Research Organization), and were successfully operated in the beam time for the slow beam extraction in January and February, 2009, which resulted in the first 30 GeV slow extracted beam delivery to the Hadron Experimental Hall.
引用
收藏
页码:336 / 339
页数:4
相关论文
共 39 条
  • [1] The 50-GeV proton synchrotron and proposed pulsed proton beam facility in J-PARC project
    Mori, Y
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2004, 532 (1-2): : 184 - 195
  • [2] Beam commissioning and operation of the J-PARC main ring synchrotron
    Koseki, Tadashi
    Arakaki, Yoshitugu
    Chin, Yong Ho
    Hara, Keigo
    Hasegawa, Katsushi
    Hashimoto, Yoshinori
    Hori, Yoichiro
    Igarashi, Susumu
    Ishii, Koji
    Kamikubota, Norihiko
    Kimura, Takuro
    Koseki, Kunio
    Fan, Kuanjyun
    Kubota, Chikashi
    Kuniyasu, Yuu
    Kurimoto, Yoshinori
    Lee, Seishu
    Matsumoto, Hiroshi
    Molodozhentsev, Alexander
    Morita, Yuichi
    Murasugi, Shigeru
    Muto, Ryotaro
    Naito, Fujio
    Nakagawa, Hidetoshi
    Nakamura, Shu
    Niki, Kazuaki
    Ohmi, Kazuhito
    Ohmori, Chihiro
    Okada, Masashi
    Okamura, Katsuya
    Oogoe, Takao
    Ooya, Kazufumi
    Sato, Kenichi
    Sato, Yoichi
    Sato, Yoshihiro
    Satou, Kenichirou
    Shimamoto, Masayuki
    Shirakata, Masashi
    Someya, Hirohiko
    Sugimoto, Takuya
    Takano, Junpei
    Takeda, Yasuhiro
    Takiyama, Yoichi
    Tejima, Masaki
    Toda, Makoto
    Tomizawa, Masahito
    Toyama, Takeshi
    Uota, Masahiko
    Yamada, Shuei
    Yamamoto, Noboru
    PROGRESS OF THEORETICAL AND EXPERIMENTAL PHYSICS, 2012, 2012 (01):
  • [3] Installation and radiation maintenance scenario for J-PARC 50 GeV Synchrotron
    Yoshioka, M
    Kobayashi, H
    Oogoe, T
    Takeuchi, Y
    Watanabe, Y
    Kuniyasu, Y
    Oki, H
    Takiyama, Y
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 1991 - 1993
  • [4] Design study of Muon beam from J-PARC 3 GeV rapid synchrotron
    Shimomura, K
    Ishida, K
    Doornbos, J
    Strasser, P
    Kawamura, N
    Miyake, Y
    Nishiyama, K
    Makimura, S
    Miyadera, H
    Magamine, K
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2006, 155 : 343 - 345
  • [5] Superconducting magnet system at the 50 GeV proton beam line for the J-PARC neutrino experiment
    Ogitsu, T
    Makida, Y
    Kobayashi, T
    Ajima, Y
    Doi, Y
    Higashi, N
    Iwamoto, Y
    Ichikawa, A
    Kimura, N
    Nakamoto, T
    Ohhata, H
    Shintomi, T
    Takasaki, M
    Tanaka, K
    Terashima, A
    Yamamoto, A
    Obana, T
    Anerella, M
    Escallier, J
    Gupta, R
    Ganetis, G
    Harrison, M
    Jain, A
    Muratore, J
    Parker, B
    Wanderer, P
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2004, 14 (02) : 604 - 607
  • [6] Design study of a thin-septum magnet for slow extraction system of J-PARC 50 GeV ring
    Fan, Kuanjun
    Sakai, Izumi
    Arakaki, Yoshitugu
    Tomizawa, Masahito
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2006, 565 (02): : 439 - 443
  • [7] J-PARC muon science facility with use of 3 GeV proton beam
    Miyake, Y
    Kawamura, N
    Makimura, S
    Strasser, P
    Shimomura, K
    Nishiyama, K
    Beveridge, JL
    Kadono, R
    Sato, N
    Fukuchi, K
    Nagamine, K
    Higemoto, W
    Ishida, K
    Matsuzaki, T
    Watanabe, I
    Matsuda, Y
    Iwasaki, M
    Nakamura, SN
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2005, 149 : 393 - 395
  • [8] Design of superconducting combined function magnets for the 50 GeV proton beam line for the J-PARC neutrino experiment
    Nakamoto, T
    Higashi, N
    Ogitsu, T
    Terashima, A
    Ajima, Y
    Anerella, M
    Gupta, R
    Hattori, H
    Ichihara, T
    Iwamoto, Y
    Kimura, N
    Makida, Y
    Obana, T
    Tanaka, K
    Wanderer, P
    Yamamoto, A
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2004, 14 (02) : 616 - 619
  • [9] Monte carlo calculations for the shielding design of beam injection and extraction areas at the 3-GeV synchrotron in J-PARC
    Japan Atomic Energy Agency, Tokai-mura, Ibaraki 319-1195, Japan
    不详
    Nucl Technol, 2 (519-523):
  • [10] MONTE CARLO CALCULATIONS FOR THE SHIELDING DESIGN OF BEAM INJECTION AND EXTRACTION AREAS AT THE 3-GeV SYNCHROTRON IN J-PARC
    Nakane, Yoshihiro
    Abe, Teruo
    Nakashima, Hiroshi
    NUCLEAR TECHNOLOGY, 2009, 168 (02) : 519 - 523