Detailed scheduling of harvest teams and robust use of harvest and transportation resources

被引:10
|
作者
Frisk, Mikael [1 ]
Flisberg, Patrik [1 ]
Ronnqvist, Mikael [1 ,2 ]
Andersson, Gert [1 ]
机构
[1] Forestry Res Inst Sweden, Uppsala, Sweden
[2] Univ Laval, Dept Genie Mecan, Quebec City, PQ, Canada
关键词
Harvesting; logistics; transportation; planning; optimization; scheduling; FOREST INDUSTRY; OPERATIONS; CHAIN; MODEL;
D O I
10.1080/02827581.2016.1206144
中图分类号
S7 [林业];
学科分类号
0829 ; 0907 ;
摘要
Planning activities of harvest teams (harvesting and forwarding) and transportation is critical for efficient procurement of roundwood from forests to mills. The planning process involves many integrated decisions that consider process, spatial and temporal aspects. The spatial aspect concerns which area to harvest, which machine team to use, the mill to which the timber should be allocated and where to store the timber. The process decisions involve which bucking instruction to use. The temporal aspect concerns when to harvest, when to transport in order to meet specific demand at mills, and when to store the timber. Temporal decisions also include determining a detailed schedule for each harvest team. Such a schedule includes starting time and movement time between harvest areas. This is complicated by the harvest team having different home bases and different machine systems with their specific performance description and capacities. The overall planning problem can be formulated into one optimization model, but such a model is too large for practical use and cannot be solved in a reasonable time. We propose a decomposition scheme where a sequence of aggregated models, or limited parts of the model, is solved to find high-quality solutions quickly. We test the scheduling in cases involving two large Swedish forest companies.
引用
收藏
页码:681 / 690
页数:10
相关论文
共 50 条
  • [1] SCHEDULING BIOPRODUCTION HARVEST
    LIANG, T
    HUANG, W
    WANG, JK
    OPERATIONS RESEARCH, 1971, 19 (07) : 1698 - &
  • [2] On the Importance of Integrating Transportation Costs into the Tactical Forest Harvest Scheduling Model
    Naderializadeh, Nader
    Crowe, Kevin A.
    Pulkki, Reino
    CROATIAN JOURNAL OF FOREST ENGINEERING, 2020, 41 (02) : 267 - 276
  • [3] Hybrid heuristic strategies for planning and scheduling forest harvest and transportation activities
    Moura, Arnaldo Vieira
    Scaraficci, Rafael Augusto
    CSE 2008:11TH IEEE INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND ENGINEERING, PROCEEDINGS, 2008, : 447 - 454
  • [4] Harvest optimization for sustainable agriculture: The case of tea harvest scheduling
    Sarimehmet, Bedirhan
    Pinarbasi, Mehmet
    Alakas, Haci Mehmet
    Eren, Tamer
    ARTIFICIAL INTELLIGENCE IN AGRICULTURE, 2023, 10 : 35 - 45
  • [5] A robust optimization approach protected harvest scheduling decisions against uncertainty
    Palma, Cristian D.
    Nelson, John D.
    CANADIAN JOURNAL OF FOREST RESEARCH, 2009, 39 (02) : 342 - 355
  • [6] Spatial uncertainty in harvest scheduling
    Ran Wei
    Alan T. Murray
    Annals of Operations Research, 2015, 232 : 275 - 289
  • [7] Spatial uncertainty in harvest scheduling
    Wei, Ran
    Murray, Alan T.
    ANNALS OF OPERATIONS RESEARCH, 2015, 232 (01) : 275 - 289
  • [8] Multiple solution harvest scheduling
    Van Deusen, PC
    SILVA FENNICA, 1999, 33 (03) : 207 - 216
  • [9] VEHICLE SCHEDULING IN A HARVEST SEASON
    Gvozdenovic, Nebojsa
    Brcanov, Dejan
    EKONOMIKA POLJOPRIVREDA-ECONOMICS OF AGRICULTURE, 2018, 65 (02): : 633 - 642
  • [10] TIMBER HARVEST SCHEDULING - REPLY
    ADAMS, DM
    HAYNES, RW
    DARR, DR
    JOURNAL OF FORESTRY, 1978, 76 (03) : 137 - &