Spatial scheduling algorithm minimising makespan at block assembly shop in shipbuilding

被引:27
|
作者
Zheng, Junli [1 ]
Jiang, Zhibin [1 ]
Chen, Qiang [1 ]
Liu, Qunting [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Ind Engn & Logist Management, Sch Mech Engn, Shanghai 200240, Peoples R China
关键词
makespan; spatial scheduling; assembly shop; shipbuilding; block; OPTIMIZATION; COMPANY; SYSTEMS;
D O I
10.1080/00207541003709536
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Spatial scheduling pursues optimal sequencing and dynamic spatial layouts that satisfy traditional restrictions in resource capacity and due dates. In shipbuilding, block spatial scheduling can be regarded as arranging some polygonal objects within rectangular work plates in an optimal sequence. This problem is important because of its impact on shipbuilding productivity and it is a NP-hard problem due to the complex constraints. In this paper, detailed analysis and mathematical description are made on block shape and block intersection. Based on the investigations of the characteristics of block shapes, the corresponding processing techniques and typical constraints, a mathematical model for block spatial scheduling is developed. Subsequently, a block spatial scheduling greedy algorithm with the objective of minimising makespan is presented using several proposed spatial scheduling strategies. The algorithm is implemented by developing a block spatial scheduling system at a block assembly shop, through which visual scheduling results of daily block layouts and the progress charts for all blocks can be obtained. Moreover, several main spatial scheduling performance indicators are proposed for comparing the proposed greedy algorithm with the existing grid algorithm and manual methods. A case study is made with real data from a shipyard, and the result shows that better performance and higher efficiency can be achieved in a short computational time.
引用
收藏
页码:2351 / 2371
页数:21
相关论文
共 50 条
  • [1] Spatial Scheduling Optimization Algorithm for Block Assembly in Shipbuilding
    Shang, Zhengyang
    Gu, Jinan
    Ding, Wei
    Duodu, Enock A.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
  • [2] MULTI-OBJECTIVE SPATIAL SCHEDULING AT BLOCK ASSEMBLY SHOP IN SHIPBUILDING
    Zheng, Junli
    Jiang, Zhibin
    Chen, Feng
    Chen, Qiang
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 116 - 124
  • [3] SPATIAL SCHEDULING AND WORKFORCE ASSIGNMENT PROBLEM IN BLOCK ASSEMBLY SHOP OF SHIPBUILDING
    Tao, Ning-Rong
    Jiang, Zu-Hua
    Zhen, Lu
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2014, 31 (01)
  • [4] Minimizing, Makespan at Module Assembly Shop in Shipbuilding
    Zheng, Junli
    Jiang, Zhibin
    Chen, Feng
    Chen, Qiang
    IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 1794 - +
  • [5] Complex shape shipbuilding block spatial scheduling algorithm
    Wang, Jinjian
    Du, Jiwang
    Fan, Xiumin
    He, Qichang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (11): : 2945 - 2954
  • [6] A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project
    Park, C
    Chung, KH
    Park, JC
    Cho, KK
    Baek, TH
    Son, EI
    PRODUCTION PLANNING & CONTROL, 2002, 13 (04) : 342 - 354
  • [7] A Genetic Algorithm for Flow Shop Scheduling with Assembly Operations to Minimize Makespan
    Bhongade A.S.
    Khodke P.M.
    Bhongade, A.S. (ajay_bhongade@rediffmail.com), 1600, Springer (95): : 89 - 96
  • [8] Minimising makespan in distributed assembly hybrid flowshop scheduling problems
    Ying, Kuo-Ching
    Lin, Shih-Wei
    Chen, Kuan-Fu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (05) : 1674 - 1691
  • [9] Spatial scheduling problem with time window constraint for block assembly in shipbuilding
    Tao, Ning-Rong
    Jiang, Zu-Hua
    Liu, Jian-Feng
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (12): : 2674 - 2679
  • [10] A genetic algorithm for minimizing makespan of block erection in shipbuilding
    Bao Jinsong
    Hu Xiaofeng
    Jin Ye
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2009, 20 (04) : 500 - 512