Optimal daily operation of reservoirs subject to probabilistic flood constraints

被引:0
|
作者
Turgeon, A [1 ]
机构
[1] Hydro Quebec, Varennes, PQ, Canada
来源
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper addresses the problem of determining the optimal daily operating policy of a river system subject to probabilistic flood constraints. This optimization problem is stochastic because streamflows are random. One of the difficulties is to take into account the streamflow persistence and, more specifically, the fact that there may be several consecutive days of high flow. This is important because floods usually occur during those periods. Unfortunately, the techniques for solving stochastic optimization problems cannot generally take into account long persistence. This paper presents a method that solves the problem in two steps. The first step determines flood control rule curves for the reservoirs that take into account streamflow persistence. Any reservoir operating policy that respects these rule curves satisfies the probabilistic flood constraints. The second step is used to determine the operating policy, among those that respect the flood control rule curves, that maximizes the generation of hydroelectric power. This is done without taking into consideration streamflow persistence.
引用
收藏
页码:153 / 162
页数:10
相关论文
共 50 条
  • [1] Daily operation of reservoir subject to yearly probabilistic constraints
    Turgeon, A
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2005, 131 (05): : 342 - 350
  • [2] Optimal flood control operation for the Three Gorges and Qingjiang cascade reservoirs
    Guo, Shenglian
    Li, Yu
    Chen, Jionghong
    HYDROLOGICAL CYCLE AND WATER RESOURCES SUSTAINABILITY IN CHANGING ENVIRONMENTS, 2011, 350 : 743 - 748
  • [3] Optimal Operation of Parallel Reservoirs System with Limited Storage Capacity for Flood Mitigation
    Thanh Hao Nguyen
    Gourbesville, Philippe
    ADVANCES IN HYDROINFORMATICS: MODELS FOR COMPLEX AND GLOBAL WATER ISSUES-PRACTICES AND EXPECTATIONS, 2022, : 1051 - 1064
  • [5] Optimal method to establish joint flood control operation rules with flood forecast information for cascade reservoirs
    Zhang, Gai-Hong
    Wang, Guo-Li
    Zhang, Jing
    Tian, Li
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (01): : 123 - 130
  • [6] OPERATION FLOOD - A FEW CONSTRAINTS
    THIRUNAVAKKARASU, M
    PRABAHARAN, R
    RAMASAMY, C
    INDIAN JOURNAL OF SOCIAL WORK, 1992, 53 (01): : 115 - 118
  • [7] Adaptive Genetic Algorithm for Daily Optimal Operation of Cascade Reservoirs and its Improvement Strategy
    Kan Yang
    Jiao Zheng
    Min Yang
    Ran Zhou
    Guoshuai Liu
    Water Resources Management, 2013, 27 : 4209 - 4235
  • [8] Adaptive Genetic Algorithm for Daily Optimal Operation of Cascade Reservoirs and its Improvement Strategy
    Yang, Kan
    Zheng, Jiao
    Yang, Min
    Zhou, Ran
    Liu, Guoshuai
    WATER RESOURCES MANAGEMENT, 2013, 27 (12) : 4209 - 4235
  • [9] Optimal operation of complex flood control system composed of cascade reservoirs, navigation-power junctions, and flood storage areas
    Zhu D.
    Mei Y.
    Xu X.
    Chen J.
    Ben Y.
    Water (Switzerland), 2020, 12 (07):
  • [10] Optimal Operation of Complex Flood Control System Composed of Cascade Reservoirs, Navigation-Power Junctions, and Flood Storage Areas
    Zhu, Di
    Mei, Yadong
    Xu, Xinfa
    Chen, Junhong
    Ben, Yue
    WATER, 2020, 12 (07)