JOB-SHOP SCHEDULING PROBLEM BASED ON IMPROVED CUCKOO SEARCH ALGORITHM

被引:10
|
作者
Hu, H. X. [1 ,4 ]
Lei, W. X. [2 ]
Gao, X. [3 ]
Zhang, Y. [1 ]
机构
[1] Hohai Univ, Coll Comp & Informat, Nanjing 211100, Jiangsu, Peoples R China
[2] Hohai Univ, Sch Publ Adm, Nanjing 211100, Jiangsu, Peoples R China
[3] Nanjing Inst Ind Technol, Coll Elect Engn, Nanjing 210023, Jiangsu, Peoples R China
[4] Tibet Agr & Anim Husb Coll, Dept Elect Engn, Lhasa 860000, Tibet, Peoples R China
基金
中国国家自然科学基金;
关键词
Job-Shop Scheduling Problem ([!text type='JS']JS[!/text]P); Improved Cuckoo Search Algorithm (ICSA); Numerical Simulation;
D O I
10.2507/IJSIMM17(2)CO8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper makes an in-depth exploration into the job-shop scheduling problem (JSP). After reviewing the related literature, the local search mechanism of the particle swarm algorithm (PSA) and the largespan search principle of standard cuckoo search algorithm (CSA) were combined into an improved cuckoo search algorithm (ICSA), which is capable of both local search and global search. Later, several simulation experiments were carried out on the LA type typical library proposed by Lawrence, and the stability and accuracy of the ICSA was contrasted with those of the PSA and the genetic algorithm (GA) based on the means and variances in multiple iterations. After the comparison, a convergence analysis of the ICSA was specially designed for our model. The results demonstrate that the ICSA provides a better tool for solving the JSP than other algorithms. The research findings lay a solid theoretical basis for the JSP in the actual production process.
引用
收藏
页码:337 / 346
页数:10
相关论文
共 50 条
  • [1] An improved genetic algorithm with recurrent search for the job-shop scheduling problem
    Xing, Yingjie
    Wang, Zhuqing
    Sun, Jing
    Wang, Wanlei
    [J]. WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3386 - +
  • [2] An improved genetic algorithm for Job-shop scheduling problem
    Lou Xiao-fang
    Zou Feng-xing
    Gao Zheng
    Zeng Ling-li
    Ou Wei
    [J]. CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2595 - +
  • [3] Improved genetic algorithm for the job-shop scheduling problem
    Tung-Kuan Liu
    Jinn-Tsong Tsai
    Jyh-Horng Chou
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 27 : 1021 - 1029
  • [4] Improved genetic algorithm for the job-shop scheduling problem
    Liu, TK
    Tsai, JT
    Chou, JH
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 27 (9-10): : 1021 - 1029
  • [5] An Improved Genetic Algorithm for the Job-Shop Scheduling Problem
    Hong, Hui
    Li, Tianying
    Wang, Hongtao
    [J]. DCABES 2008 PROCEEDINGS, VOLS I AND II, 2008, : 621 - +
  • [6] Discrete Cuckoo Search Algorithm for Job Shop Scheduling Problem
    Ouaarab, Aziz
    Ahiod, Belaid
    Yang, Xin-She
    Abbad, Mohammed
    [J]. 2014 IEEE INTERNATIONAL SYMPOSIUM ON INTELLIGENT CONTROL (ISIC), 2014, : 1872 - 1876
  • [7] A High Performance Search Algorithm for Job-Shop Scheduling Problem
    Wang, Shao-Juan
    Tsai, Chun-Wei
    Chiang, Ming-Chao
    [J]. 9TH INTERNATIONAL CONFERENCE ON EMERGING UBIQUITOUS SYSTEMS AND PERVASIVE NETWORKS (EUSPN-2018) / 8TH INTERNATIONAL CONFERENCE ON CURRENT AND FUTURE TRENDS OF INFORMATION AND COMMUNICATION TECHNOLOGIES IN HEALTHCARE (ICTH-2018), 2018, 141 : 119 - 126
  • [8] Solving Job-shop Scheduling Problem by an Improved Genetic Algorithm
    Yang Yanli
    Ke Weiwei
    [J]. PRECISION ENGINEERING AND NON-TRADITIONAL MACHINING, 2012, 411 : 588 - 591
  • [9] An Improved Cooperative PSO Algorithm for Job-Shop Scheduling Problem
    Zheng, Yuyan
    Qu, Jianhua
    Wang, Lin
    [J]. HUMAN CENTERED COMPUTING, HCC 2014, 2015, 8944 : 265 - 277
  • [10] Solving Job-Shop Scheduling Problem with Improved Genetic Algorithm
    Wu, Weijun
    Yu, Songnian
    Ding, Wang
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL PRE-OLYMPIC CONGRESS ON COMPUTER SCIENCE, VOL II: INFORMATION SCIENCE AND ENGINEERING, 2008, : 348 - 352