共 50 条
- [1] Using Firefly Algorithm to Solve Resource Constrained Project Scheduling Problem [J]. PROCEEDINGS OF SEVENTH INTERNATIONAL CONFERENCE ON BIO-INSPIRED COMPUTING: THEORIES AND APPLICATIONS (BIC-TA 2012), VOL 1, 2013, 201 : 417 - +
- [4] A Firefly Algorithm to Solve the Manufacturing Cell Design Problem [J]. 2016 11TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI), 2016,
- [5] A Firefly Algorithm to Solve the Manufacturing Cell Design Problem [J]. ARTIFICIAL INTELLIGENCE PERSPECTIVES IN INTELLIGENT SYSTEMS, VOL 1, 2016, 464 : 103 - 114
- [6] Intelligent Water Drop Algorithm (IWD) to solve Software Project Scheduling Problem [J]. 2016 11TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI), 2016,
- [7] A Diversity-Adaptive Hybrid Evolutionary Algorithm to Solve a Project Scheduling Problem [J]. INTELLIGENT DATA ENGINEERING AND AUTOMATED LEARNING - IDEAL 2014, 2014, 8669 : 412 - 423
- [8] Using Bees Algorithm to Solve the Resource Constrained Project Scheduling Problem in PSPLIB [J]. THEORETICAL AND MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE, 2011, 164 : 486 - +
- [9] Metaheuristics to solve the software project scheduling problem [J]. 2012 XXXVIII CONFERENCIA LATINOAMERICANA EN INFORMATICA (CLEI), 2012,