Simultaneous nitrogen and phosphorus removal in a continuously fed and aerated membrane bioreactor

被引:8
|
作者
Holakoo, L
Nakhla, G [1 ]
Yanful, EK
Bassi, AS
机构
[1] Univ Western Ontario, Dept Chem & Biochem Engn, London, ON N6A 5B9, Canada
[2] Univ Western Ontario, Dept Civil & Engn, London, ON N6A 5B9, Canada
关键词
D O I
10.1061/(ASCE)0733-9372(2005)131:10(1469)
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This research demonstrated the feasibility of simultaneous biological nitrogen and phosphorous removal in a single tank membrane bioreactor without cycling of air and/or feed through operation at a low dissolved oxygen (DO) and a high biomass concentration. Chemical oxygen demand removal efficiency was more than 98% and total nitrogen removal efficiency was 55%. Seventy-five percent of the total nitrogen removal was through simultaneous nitrification-denitrification (SND) and 25% through assimilation into the biomass. Interestingly, more than 98% phosphorous was removed and microbiological analysis showed the presence of polyphosphate-accumulating organisms in the activated sludge. The operating mixed-liquor suspended solids was between 16 and 23 g/L. The optimum DO was found to be 0.7-0.8 mg/L.
引用
收藏
页码:1469 / 1472
页数:4
相关论文
共 50 条
  • [1] An innovative membrane bioreactor (MBR) system for simultaneous nitrogen and phosphorus removal
    Sun, Fei-yun
    Wang, Xiao-mao
    Li, Xiao-yan
    [J]. PROCESS BIOCHEMISTRY, 2013, 48 (11) : 1749 - 1756
  • [2] NITROGEN AND PHOSPHORUS REMOVAL BY SUBMERGED MEMBRANE BIOREACTOR
    Li Na
    Li Zhidong
    Li Guode
    Wang Yan
    Wu Shiwei
    Wang Shenghou
    Zheng Zhiguo
    [J]. JOURNAL OF ENVIRONMENTAL SYSTEMS, 2004, 31 (04): : 349 - 356
  • [3] Simultaneous effective carbon and nitrogen removals and phosphorus recovery in an intermittently aerated membrane bioreactor integrated system
    Wang, Yun-Kun
    Pan, Xin-Rong
    Geng, Yi-Kun
    Sheng, Guo-Ping
    [J]. SCIENTIFIC REPORTS, 2015, 5
  • [4] Simultaneous effective carbon and nitrogen removals and phosphorus recovery in an intermittently aerated membrane bioreactor integrated system
    Yun-Kun Wang
    Xin-Rong Pan
    Yi-Kun Geng
    Guo-Ping Sheng
    [J]. Scientific Reports, 5
  • [5] Simultaneous biological removal of nitrogen and phosphorus in a vertical bioreactor
    Reza, Maryam
    Cuenca, Manuel Alvarez
    [J]. JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2016, 4 (01): : 130 - 136
  • [6] Two stage intermittent aeration membrane bioreactor for simultaneous organic, nitrogen and phosphorus removal
    Seo, GT
    Lee, TS
    Moon, BH
    Lim, JH
    Lee, KS
    [J]. WATER SCIENCE AND TECHNOLOGY, 2000, 41 (10-11) : 217 - 225
  • [7] Two stage intermittent aeration membrane bioreactor for simultaneous organic, nitrogen and phosphorus removal
    Seo, G.T.
    Lee, T.S.
    Moon, B.H.
    Lim, J.H.
    Lee, K.S.
    [J]. 2000, IWA Publishing, UK (41)
  • [8] Simultaneous removal of organic substances and nitrogen from municipal wastewater by an intermittently aerated submerged membrane bioreactor
    Jian Yu
    Guo K. Fu
    Xiong W. Ouyang
    Wen J. Hou
    [J]. Chinese Journal of Geochemistry, 2006, 25 (Suppl 1): : 257 - 257
  • [10] Simultaneous removal of concentrated organics, nitrogen and phosphorus nutrients by an oxygen-limited membrane bioreactor
    Yang, Shengyun
    Yao, Gang
    [J]. PLOS ONE, 2018, 13 (08):