Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines

被引:60
|
作者
Epstein, Rafael [1 ]
Goic, Marcel [1 ]
Weintraub, Andres [1 ]
Catalan, Jaime [2 ]
Santibanez, Pablo [2 ]
Urrutia, Rodolfo [2 ]
Cancino, Raul [3 ]
Gaete, Sergio [3 ]
Aguayo, Augusto [3 ]
Caro, Felipe [4 ]
机构
[1] Univ Chile, Dept Ind Engn, Santiago 8370439, Chile
[2] Fdn Transferencia Tecnol, Santiago 8370481, Chile
[3] Corp Nacl Cobre, Div Norte, Teniente, Div Andina, Santiago 8370424, Chile
[4] UCLA Anderson Sch Management, Los Angeles, CA 90095 USA
关键词
OPTIMIZATION;
D O I
10.1287/opre.1110.1003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We present a methodology for long-term mine planning based on a general capacitated multicommodity network flow formulation. It considers underground and open-pit ore deposits sharing multiple downstream processing plants over a long horizon. The purpose of the model is to optimize several mines in an integrated fashion, but real size instances are hard to solve due to the combinatorial nature of the problem. We tackle this by solving the relaxation of a tight linear formulation, and we round the resulting near-integer solution with a customized procedure. The model has been implemented at Codelco, the largest copper producer in the world. Since 2001, the system has been used on a regular basis and has increased the net present value of the production plan for a single mine by 5%. Moreover, integrating multiple mines provided an additional increase of 3%. The system has allowed planners to evaluate more scenarios. In particular, the model was used to study the option of delaying by four years the conversion of Chiquicamata, Codelco's largest open-pit mine, to underground operations.
引用
收藏
页码:4 / 17
页数:14
相关论文
共 50 条
  • [1] Major Open-Pit Copper Mines Move Underground Some of the world's largest open-pit copper mining operations are heading underground with ambitious block cave production plans
    Fiscor, Steve
    [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 2010, 211 (05): : 46 - +
  • [2] A NEW METAHEURISTIC ALGORITHM FOR LONG-TERM OPEN-PIT PRODUCTION PLANNING
    Sattarvand, Javad
    Niemann-Delius, Christian
    [J]. ARCHIVES OF MINING SCIENCES, 2013, 58 (01) : 107 - 118
  • [3] A COMPUTERIZED MODEL OF OPEN-PIT LONG-TERM AND SHORT-TERM PRODUCTION SCHEDULING
    FYTAS, K
    CALDER, P
    PELLEY, C
    [J]. CIM BULLETIN, 1986, 79 (887): : 54 - 54
  • [4] A simulated annealing based stochastic long-term production scheduling of open-pit mines with stockpiling under grade uncertainty
    Danish, Abid Ali Khan
    Khan, Asif
    Muhammad, Khan
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023, 37 (01) : 43 - 65
  • [5] Tracking Production Volumes of Open-Pit Mines with Photogrammetry
    Molnar, Andras
    Domozi, Zsolt
    [J]. UKSIM-AMSS 11TH EUROPEAN MODELLING SYMPOSIUM ON COMPUTER MODELLING AND SIMULATION (EMS 2017), 2017, : 100 - 106
  • [6] An integrated approach to open-pit mines production scheduling
    Alipour, Aref
    Khodaiari, Ali Asghar
    Jafari, Ahmad
    Tavakkoli-Moghaddam, Reza
    [J]. RESOURCES POLICY, 2022, 75
  • [7] The titans of open-pit mines
    不详
    [J]. ZKG INTERNATIONAL, 2014, 67 (10): : 20 - 20
  • [8] Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules
    Chung, Joyce
    Asad, Mohammad Waqar Ali
    Topal, Erkan
    [J]. RESOURCES POLICY, 2022, 77
  • [9] Open-Pit Map: An HD Map Data Model for Open-Pit Mines
    Xu, Xingliang
    Wang, Zhuo
    Huang, Pengli
    Tian, Suchuan
    Bi, Lin
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (23):
  • [10] An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms
    Tolouei, Kamyar
    Moosavi, Ehsan
    Tabrizi, Amir Hossein Bangian
    Afzal, Peyman
    Bazzazi, Abbas Aghajani
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2021, 35 (02) : 115 - 140