Scheduling Large-Size Identical Parallel Machines with Single Server Using a Novel Heuristic-Guided Genetic Algorithm (DAS/GA) Approach

被引:1
|
作者
Abu-Shams, Mohammad [1 ]
Ramadan, Saleem [2 ]
Al-Dahidi, Sameer [3 ]
Abdallah, Abdallah [1 ]
机构
[1] German Jordanian Univ, Sch Appl Tech Sci, Ind Engn Dept, Amman 11180, Jordan
[2] Youngstown State Univ, Mech Ind & Mfg Engn, Youngstown, OH 44555 USA
[3] German Jordanian Univ, Sch Appl Tech Sci, Mech & Maintenance Engn Dept, Amman 11180, Jordan
关键词
scheduling; optimization; heuristic; genetic algorithm; identical parallel machines; apparent tardiness cost rule; MINIMIZING TOTAL TARDINESS; TOTAL WEIGHTED TARDINESS; ANT COLONY OPTIMIZATION; BATCH MACHINES; JOBS; TIMES; SHOP;
D O I
10.3390/pr10102071
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Parallel Machine Scheduling (PMS) is a well-known problem in modern manufacturing. It is an optimization problem aiming to schedule n jobs using m machines while fulfilling certain practical requirements, such as total tardiness. Traditional approaches, e.g., mix integer programming and Genetic Algorithm (GA), usually fail, particularly in large-size PMS problems, due to computational time and/or memory burden and the large searching space required, respectively. This work aims to overcome such challenges by proposing a heuristic-based GA (DAS/GA). Specifically, a large-scale PMS problem with n independent jobs and m identical machines with a single server is studied. Individual heuristic algorithms (DAS) and GA are used as benchmarks to verify the performance of the proposed combined DAS/GA on 18 benchmark problems established to cover small, medium, and large PMS problems concerning standard performance metrics from the literature and a new metric proposed in this work (standardized overall total tardiness). Computational experiments showed that the heuristic part (DAS-h) of the proposed algorithm significantly enhanced the performance of the GA for large-size problems. The results indicated that the proposed algorithm should only be used for large-scale PMS problems because DAS-h trapped GA in a region of local optima, limiting its capabilities in small- and mainly medium-sized problems.
引用
收藏
页数:17
相关论文
共 3 条
  • [1] Genetic algorithm based on heuristic rules for high-constrained large-size single-stage multi-product scheduling with parallel units
    He, Yaohua
    Hui, Chi-Wai
    [J]. CHEMICAL ENGINEERING AND PROCESSING-PROCESS INTENSIFICATION, 2007, 46 (11) : 1175 - 1191
  • [2] Dynamic Rule-Based Genetic Algorithm for Large-Size Single-stage Batch Scheduling
    He, Yaohua
    Hui, Chi-Wai
    [J]. 16TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING AND 9TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2006, 21 : 1911 - 1916
  • [3] Dual Resource Constrained Scheduling Considering Operator Working Modes and Moving in Identical Parallel Machines Using a Permutation-Based Genetic Algorithm
    Akbar, Muhammad
    Irohara, Takashi
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR DATA-DRIVEN, INTELLIGENT, COLLABORATIVE, AND SUSTAINABLE MANUFACTURING, APMS 2018, 2018, 535 : 464 - 472