On technology of hydraulic engineering structures pile foundations production

被引:0
|
作者
Popov, Valeriy P. [1 ]
Popov, Dmitriy V. [1 ]
Davidenko, Anna Yu. [1 ]
机构
[1] Samara State Univ Architecture & Civil Engn SSUAC, Molodogvardeyskaya St 194, Samara 443001, Russia
关键词
Piled foundations; Pile characteristics; Bearing capability; Geotechnical survey;
D O I
10.1016/j.proeng.2015.07.127
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper presents aims to provide analysis of non-waste technology of producing piled foundations of hydraulic engineering structures. The authors introduce a complexity of additional technical and technological steps making possible to both diminish the work-load and cut the time required. The paper also describes main stages of the work and points out the main drawbacks of the traditional technology. The authors prove that on condition of proper technique training and experience it is possible to design and produce pile fields characterized by minimal materials consumption thus saving 10-15% of zero circle estimated cost and cutting the time required for construction. (C) 2015 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:652 / 655
页数:4
相关论文
共 50 条