Real-time Optimization of a Hydropower Cascade Using a Linear Modeling Approach

被引:0
|
作者
Hamann, Andrew [1 ]
Hug, Gabriela [1 ]
机构
[1] Carnegie Mellon Univ, Pittsburgh, PA 15213 USA
关键词
Hydroelectric power; power generation scheduling; optimization methods; quadratic programming;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
For the sub-hourly real-time optimization of a hydropower cascade, it is important to model in detail the three factors which most heavily influence hydropower generation: reservoir elevation, tailrace elevation, and turbine-generator efficiency. The method proposed in this paper uses three-dimensional piecewise linearization to accurately approximate the nonlinear and non-convex hydropower production function as a function of hydraulic head and turbine discharge. We show how this piecewise linear approximation can be implemented in a model predictive control framework with promising results. We present a case study of this model applied to seven dams along the Columbia River in the United States, with a particular focus on simulating the integration of variable wind generation. The primary contribution of this paper is to introduce a new method to model power generation from hydropower facilities and to simulate and demonstrate its efficacy on a real-world system.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Real-time modeling of quantum cascade laser operation using linear combinations of intrawell properties
    Cooney, A. T.
    Sarangan, A. M.
    [J]. JOURNAL OF COMPUTATIONAL ELECTRONICS, 2010, 9 (01) : 8 - 15
  • [2] Real-time modeling of quantum cascade laser operation using linear combinations of intrawell properties
    A. T. Cooney
    A. M. Sarangan
    [J]. Journal of Computational Electronics, 2010, 9 : 8 - 15
  • [3] Real-time modeling for navigation and hydropower in the River Mosel
    Ackermann, T
    Loucks, DP
    Schwanenberg, D
    Detering, M
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2000, 126 (05): : 298 - 303
  • [4] Modularization modeling for real-time simulation of hydropower plants
    Wu, Chengming
    Li, Xianshan
    Zhang, Binqiao
    [J]. IMECS 2008: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2008, : 1436 - 1439
  • [5] Real-Time Optimization of the Mid-Columbia Hydropower System
    Hamann, Andrew
    Hug, Gabriela
    Rosinski, Stan
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (01) : 157 - 165
  • [6] Real-time optimization: an "alternative" approach
    Dormer, A
    Raynor, S
    [J]. HYDROCARBON PROCESSING, 1998, 77 (09): : 81 - +
  • [7] Unique approach to real-time optimization
    Verne, T
    Jerrit, B
    Bester, P
    [J]. HYDROCARBON PROCESSING, 1999, 78 (03): : 53 - +
  • [8] Self-Optimization System Dynamics Simulation of Real-Time Short Term Cascade Hydropower System Considering Uncertainties
    Liu Yuan
    Jianzhong Zhou
    [J]. Water Resources Management, 2017, 31 : 2127 - 2140
  • [9] An approach for Modeling real-time aspects using UML scenarios
    Bennani, M
    Elkoutbi, M
    Nafil, K
    [J]. NEW TRENDS IN SOFTWARE METHODOLOGIES, TOOLS AND TECHNIQUES, 2004, 111 : 200 - 212
  • [10] Self-Optimization System Dynamics Simulation of Real-Time Short Term Cascade Hydropower System Considering Uncertainties
    Yuan, Liu
    Zhou, Jianzhong
    [J]. WATER RESOURCES MANAGEMENT, 2017, 31 (07) : 2127 - 2140