Study on the Costs of Steel Reinforcement on the Construction of Subway Station

被引:0
|
作者
Han, Yongjun [1 ]
Wang, Limei [1 ]
机构
[1] Langfang Teachers Univ, Langfang 065000, Peoples R China
关键词
PROJECT-MANAGEMENT; SYSTEM;
D O I
10.3303/CET1651140
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to study the cost of the steel reinforcement construction in the subway station, through the analysis of the correlation between the costs of labour and ancillary equipment on the process of subway station construction, and the analysis of the correlation between the cost and the duration, and then established mathematical model of the correlation between the costs of labour and ancillary equipment and the correlation between the cost and the duration, which were based on the statistical analysis. So that it has been on the positive direction of controlling the cost and the duration on the subway construction. By the theory of coupling coordination degree model, explored the coupling mechanism of the costs of labour and ancillary equipment, and the coupling mechanism of the cost and the duration, at last established coupling mathematical model based on the data of statistical analysis. Those statistical data included No. 1 and No. 12 section of the Changsha Metro 3rd Line, and No. 6 and No. 7 section of the Changsha Metro 4th Line. Model results showed that the standard coordination degree of coupling coefficients in No. 1 and No. 12 section of the Changsha Metro the 3rd Line, and No. 6, No. 7 and No. 8 section of the Changsha Metro the 4th Line. By calculating the value of the degree of coordination were 0.9852, 0.9414, 0.9668, 0.6515 and 0.5383. Besides, the result of analytical computation showed that the duration decreased with the increase of the coefficient of the coordination degree. When the proportion of the cost of labour and ancillary equipment was 1, the total cost was minimum. Besides, when the proportion of the cost of labour and ancillary equipment was 1, the duration was the shortest time. So when on the process of subway station construction, we should adjust to the best value of the proportion between the cost of labour and ancillary equipment.
引用
收藏
页码:835 / 840
页数:6
相关论文
共 50 条
  • [1] A Case Study on the Application of the Steel Tube Slab Structure in Construction of a Subway Station
    Jia, Peng-jiao
    Zhao, Wen
    Chen, Yang
    Li, Shen-gang
    Han, Jian-yong
    Dong, Jia-chao
    [J]. APPLIED SCIENCES-BASEL, 2018, 8 (09):
  • [2] Study of construction technique for the Nanjing subway station under the Nanjing railway station
    Li, Zhao-Ping
    Li, Ming-Kai
    Huang, Qing-Hua
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2005, 24 (06): : 1061 - 1066
  • [3] Review on Construction Method of Subway Station
    Li, Wei
    [J]. MATERIALS PROCESSING TECHNOLOGY, PTS 1-3, 2012, 418-420 : 2078 - 2081
  • [4] SUBWAY CONSTRUCTION COSTS - THE ROLE OF THE ENGINEER
    ONEIL, RS
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1980, 106 (04): : 447 - 454
  • [5] BART SUBWAY CONSTRUCTION - PLANNING AND COSTS
    KUESEL, TR
    [J]. CIVIL ENGINEERING, 1969, 39 (03): : 60 - &
  • [6] Study on the structural behavior and reinforcement design of openings in subway station floor slabs
    Zhou, Dongbo
    Mei, Yuan
    Ke, Xin
    Liu, Ziyang
    Xu, Wangyang
    [J]. Journal of Building Engineering, 2024, 98
  • [7] Study on crack resistance of subway station top floor during construction
    Zhang, Jie
    [J]. Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2000, 35 (02): : 133 - 136
  • [9] The application of the LEED in subway station construction stage
    HaiZe, Pan
    Wei, Miao
    MengJie, Chen
    Jian, He
    [J]. Electronic Journal of Geotechnical Engineering, 2015, 20 (24): : 11945 - 11952
  • [10] CONSTRUCTION WORK OF A SUBWAY STATION UNDERNEATH NAGOYA STATION OF JNR.
    Ue, Hajime
    [J]. Japanese Railway Engineering, 1985, 25 (03): : 20 - 23