Numerical Simulation of Crown Pillar Behaviour in Transition from Open Pit to Underground Mining

被引:7
|
作者
Dintwe, Tumelo K. M. [1 ]
Sasaoka, Takashi [1 ]
Shimada, Hideki [1 ]
Hamanaka, Akihiro [1 ]
Moses, Dyson N. [1 ]
Peng, Ma [1 ]
Meng Fanfei [1 ]
Liu, Seifei [2 ]
Ssebadduka, Ronald [1 ]
Onyango, Joan A. [1 ]
机构
[1] Kyushu Univ, Fac Engn, Dept Earth Resource Engn, 744 Motooka, Fukuoka 8190395, Japan
[2] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Xuzhou 221116, Jiangsu, Peoples R China
关键词
Crown pillar; Open pit to underground mining; Numerical modelling; Underground mining; ROCK; STABILITY;
D O I
10.1007/s10706-021-02022-4
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Crown pillars provide regional and local support by isolating the ground surface from underground mine workings. Topography above the underground mine may be a relatively flat ground surface or an open-pit structure. Depending on what lies above and design of the underground mine, the crown pillar behaviour will differ. In transitioning setups (open pit to underground), large open pit collapses have taken place as a result of crown pillars located at the transition zone. Hence, this paper focuses on crown pillars between open pit and underground to better understand their behaviour. Taking the Zuuntsagaan Fluorite mine as an example where open pit will transform to underground mining, a remnant ore is to be left as a crown pillar to separate the two mining sections. Through numerical simulation in FLAC3D 7.0, stress distribution and failure mechanisms acting around the crown pillar were monitored as underground mining progresses. Effect of crown pillar geometrical parameters was evaluated, thus crown pillar thickness, span and dip. Further, the open pit geometry influence was also considered on the overall behaviour of the crown pillar. It was found out that in transition from open pit to underground, slope and stope walls closing in on the crown pillar induce stresses that act as loading from the pillar sides, which in turn influence the failure process.
引用
收藏
页码:2213 / 2229
页数:17
相关论文
共 50 条
  • [1] Numerical Simulation of Crown Pillar Behaviour in Transition from Open Pit to Underground Mining
    Tumelo K. M. Dintwe
    Takashi Sasaoka
    Hideki Shimada
    Akihiro Hamanaka
    Dyson N. Moses
    Ma Peng
    Meng Fanfei
    Seifei Liu
    Ronald Ssebadduka
    Joan A. Onyango
    [J]. Geotechnical and Geological Engineering, 2022, 40 : 2213 - 2229
  • [2] Use of an artificial crown pillar in transition from open pit to underground mining
    Xu, Shuai
    Suorineni, Fidelis T.
    An, Long
    Li, Yuan Hui
    Jin, Chang Yu
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2019, 117 : 118 - 131
  • [3] Evolution numerical simulation method for optimizing boundary roof pillar in transition from open-pit mining to underground mining
    Jiang An-nan
    Chen Yong
    [J]. ROCK AND SOIL MECHANICS, 2007, 28 (04) : 774 - 778
  • [4] Numerical Simulation on the Stability of Slope with Different Underground Mining Location in Open-Pit to Underground Mining
    Sun, Shi-guo
    Xie, Yu
    Wang, Jia
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS, MACHINERY AND MATERIALS (IIMM 2015), 2015, : 79 - 84
  • [6] NUMERICAL MODELING OF OPEN PIT (OP) TO UNDERGROUND (UG) TRANSITION IN COAL MINING
    Phu Minh Vuong Nguyen
    Niedbalski, Zbigniew
    [J]. STUDIA GEOTECHNICA ET MECHANICA, 2016, 38 (03) : 35 - 48
  • [7] Optimal mining model of transition from open-pit to underground mining
    Wang, Xin-Min
    Zhao, Jian-Wen
    Zhang, Qin-Li
    Wu, Peng
    [J]. Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (04): : 1434 - 1439
  • [8] Multi-method Based Optimization of Crown Pillar Thickness from Open Pit to Underground
    Xu S.
    An L.
    Li Y.-H.
    Lu D.
    [J]. An, Long (anlong@mail.neu.edu.cn), 2018, Northeast University (39): : 1181 - 1186
  • [9] Optimized depth of transition from Open Pit to underground coal mining
    A. A. Ordin
    I. V. Vasil’ev
    [J]. Journal of Mining Science, 2014, 50 : 696 - 706
  • [10] CONSTRUCTION OF NEW MULTI-FUNCTION TYPE ARTIFICIAL BOUNDARY PILLAR FOR TRANSITION FROM OPEN PIT TO UNDERGROUND MINING
    Ren, Honggang
    Tan, Zhuoying
    Feng, Panxue
    [J]. CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2019, 28 (01): : 89 - 102