Characterizing relationship between demand surge and post-disaster reconstruction capacity considering poverty rates

被引:7
|
作者
Kim, Sooin [1 ]
Shahandashti, Mohsen [1 ]
机构
[1] Univ Texas Arlington, Dept Civil Engn, 416 S Yates St, Arlington, TX 76010 USA
关键词
Demand surge; Reconstruction capacity; Poverty rates; Natural hazards; Quantitative methods; LINEAR-REGRESSION; HOUSING RECOVERY; DISASTER; IMPACT; COST; VULNERABILITY; WEATHER; MODEL;
D O I
10.1016/j.ijdrr.2022.103014
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The post-disaster reconstruction capacity of communities determines their survival after largescale disasters. Unexpected and substantial increases in construction costs in response to the significant reconstruction demands following disasters, known as demand surge, can decrease reconstruction speed and limit the reconstruction capacity of communities. The objective of this research is to investigate the relationships between labor wage fluctuation (representing demand surge) and change in building permits (representing reconstruction capacity) of various communities considering their poverty rates. The county-level data of building permits, construction labor wages, and poverty rates were collected for the affected counties by devastating hurricanes. Multiple regression models were utilized to quantify the relationships between wage fluctuation and change in building permits in counties with above-average and below-average state poverty rates. The results show that wage fluctuation is negatively correlated with the change in building permits in counties with above-average poverty rates. In contrast, fluctuation does not show a statistically significant correlation with the change in building permits in counties with belowaverage poverty rates. These findings indicate that demand surge has a statistically significant negative relationship with the reconstruction capacity of counties with above-average poverty rates, while there is no meaningful relationship with the reconstruction capacity of counties with below-average poverty rates. The findings of this research can assist risk-mitigation agencies in identifying more sensitive communities, prioritizing the reconstruction needs, and enhancing risk reduction strategies considering the socioeconomic characteristics of communities.
引用
收藏
页数:12
相关论文
共 22 条
  • [1] Community Capacity Building and Post-disaster Psychosocial Reconstruction
    Chan, Cecilia L. W.
    Sun, Angie H. Y.
    Ho, Andy H. Y.
    Wang, X. L.
    Wang, X. Y.
    Zhang, Braven Q.
    Zhang, X. L.
    PROCEEDING OF INTERNATIONAL DISASTER AND RISK CONFERENCE CHENGDU 2009, 2009, : 69 - 73
  • [2] Dynamic relationship between functional stress and strain capacity of post-disaster infrastructure
    Choi, Juyeong
    Deshmukh, Abhijeet
    Naderpajouh, Nader
    Hastak, Makarand
    NATURAL HAZARDS, 2017, 87 (02) : 817 - 841
  • [3] Dynamic relationship between functional stress and strain capacity of post-disaster infrastructure
    Juyeong Choi
    Abhijeet Deshmukh
    Nader Naderpajouh
    Makarand Hastak
    Natural Hazards, 2017, 87 : 817 - 841
  • [4] Enhancing post-disaster reconstruction capacity through lifelong learning in higher education
    Thayaparan, Menaha
    Siriwardena, Mohan
    Malalgoda, Chamindi Ishara
    Amaratunga, Dilanthi
    Lill, Irene
    Kaklauskas, Arturas
    DISASTER PREVENTION AND MANAGEMENT, 2015, 24 (03) : 338 - 354
  • [5] Capacity-aware Cost-efficient Network Reconstruction for Post-Disaster Scenario
    Wang, Xiaoyan
    Zhou, Hao
    Zhong, Lei
    Ji, Yusheng
    Takano, Kiyoshi
    Yamada, Shigeki
    Xue, Guoliang
    2016 IEEE 27TH ANNUAL INTERNATIONAL SYMPOSIUM ON PERSONAL, INDOOR, AND MOBILE RADIO COMMUNICATIONS (PIMRC), 2016, : 2115 - 2120
  • [6] Seismic performance assessment of highway bridge networks considering post-disaster traffic demand of a transportation system in emergency conditions
    Guo, Anxin
    Liu, Zhenliang
    Li, Suchao
    Li, Hui
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2017, 13 (12) : 1523 - 1537
  • [7] Relationship between the organizational structure in implementing Post-Disaster Housing reconstruction and outcome characteristics: A study on urban dujiangyan after the Wenchuan Earthquake
    Xi, Jiaoru
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2022, 80
  • [8] Relationship between the organizational structure in implementing Post-Disaster Housing reconstruction and outcome characteristics: A study on urban dujiangyan after the Wenchuan Earthquake
    Xi, Jiaoru
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2022, 80
  • [9] Investigating the Relationship Between Disaster Preparedness Knowledge, Disaster Related Stress, and Post-Disaster Depression Among Students and Faculty in Higher Education
    Rawcliffe, Renee M.
    Dawson, Beverly Araujo
    Archibald, Paul C.
    Lopez-Humphreys, Mayra
    SOCIAL WORK IN PUBLIC HEALTH, 2025, 40 (01) : 31 - 43
  • [10] The relationship between dynamic capabilities, the firm's resource base and performance in a post-disaster environment
    Battisti, Martina
    Deakins, David
    INTERNATIONAL SMALL BUSINESS JOURNAL-RESEARCHING ENTREPRENEURSHIP, 2017, 35 (01): : 78 - 98