The impact of the uncertainty of dike breach development time on flood hazard

被引:24
|
作者
Vorogushyn, Sergiy [1 ]
Apel, Heiko [1 ]
Merz, Bruno [1 ]
机构
[1] Deutsch GeoForschungsZentrum GFZ, Sect Hydrol 5 4, D-14473 Potsdam, Germany
关键词
Flood hazard; Dike failure; Breach development time; Uncertainty; RISK; PREDICTIONS; INUNDATION;
D O I
10.1016/j.pce.2011.01.005
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The impact of uncertainty of dike breach development time on breach probabilities of downstream dikes and flood hazard was investigated by means of a Monte-Carlo-based probabilistic-deterministic flood hazard model. Three scenarios of breach development time were compared - one fixed-time scenario and two scenarios with stochastically generated breach development time. For the latter two scenarios, the dependency between the ultimate breach width and breach development time was modelled using a fully-dependent and a fully-independent copula. The simulation results suggest that in view of uncertainty in the flood hydrograph shape, dike breach locations, breach points in time and ultimate breach widths, the uncertainty due to the dike breach development time and dependence structure with the ultimate breach width should not be neglected when simulating multiple interdependent breaches. A significant difference in dike failure probabilities was simulated for a number of dikes in a 100-year flood scenario. Large changes in flood hazard are, however, relatively unlikely for a selected river reach. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:319 / 323
页数:5
相关论文
共 50 条
  • [1] TEMPORAL DEVELOPMENT OF A SEA DIKE BREACH
    Bernitt, Laurits
    Madsen, Holger Toxvig
    [J]. COASTAL ENGINEERING 2008, VOLS 1-5, 2009, : 3237 - +
  • [2] The 2015 Flood Impact due to the Overflow and Dike Breach of Kinu River in Joso City, Japan
    Nagumo, Naoko
    Ohara, Miho
    Kuribayashi, Daisuke
    Sawano, Hisaya
    [J]. JOURNAL OF DISASTER RESEARCH, 2016, 11 (06) : 1112 - 1127
  • [3] Environmental impact of Huayuankou dike breach in 1938
    Li, Hucheng
    Wang, Bingbing
    Yan, Jun
    Qiu, Baorui
    Zhuo, Fei
    [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND ENVIRONMENTAL ENGINEERING, 2016, 53 : 1105 - 1108
  • [4] Dike Breach Risks of Different Flood Conditions in the Lower Yellow River
    Xia Fuqiang
    Wu Shaohong
    Yang Qinye
    Kang Xiangwu
    Ma Xin
    [J]. CHINESE JOURNAL OF POPULATION RESOURCES AND ENVIRONMENT, 2010, 8 (01) : 18 - 27
  • [5] Assessment of discharge through a dike breach and simulation of flood wave propagation
    Kamrath, P
    Disse, M
    Hammer, M
    Köngeter, J
    [J]. NATURAL HAZARDS, 2006, 38 (1-2) : 63 - 78
  • [6] Assessment of Discharge through a Dike Breach and Simulation of Flood Wave Propagation
    Paul Kamrath
    Markus Disse
    Matthias Hammer
    Jürgen Köngeter
    [J]. Natural Hazards, 2006, 38 : 63 - 78
  • [7] Dike Breach Risks of Different Flood Conditions in the Lower Yellow River
    Xia Fuqiang1
    2.Graduate School of Chinese Academy of Sciences
    3.Institute of Scientific and Technical Information of China
    [J]. Chinese Journal of Population,Resources and Environment, 2010, (01) : 18 - 27
  • [8] A new methodology for flood hazard assessment considering dike breaches
    Vorogushyn, S.
    Merz, B.
    Lindenschmidt, K. -E.
    Apel, H.
    [J]. WATER RESOURCES RESEARCH, 2010, 46
  • [9] Parameter uncertainty in modelling dam breach and its flood
    Yang, JXL
    [J]. HYDROPOWER '97, 1997, : 551 - 560
  • [10] Dealing with uncertainty in flood risk assessment of dike rings in the netherlands
    Van der Most, H
    Wehrung, M
    [J]. NATURAL HAZARDS, 2005, 36 (1-2) : 191 - 206