MODEL-BASED ANALYSIS OF THE START-UP IMPROVEMENT OF A CCPP DUE TO STEAM TURBINE WARM-KEEPING WITH AIR

被引:0
|
作者
Toebben, Dennis [1 ]
Burgard, Tobias [1 ]
Berg, Sebastian [1 ]
Wirsum, Manfred [1 ]
Pei, Liu [2 ]
Zheng, Li [2 ]
Mohr, Wolfgang F. D. [3 ]
Helbig, Klaus [4 ]
机构
[1] Rhein Westfal TH Aachen, Inst Power Plant Technol Steam & Gas Turbines, Templergraben 55, D-52064 Aachen, Germany
[2] Tsinghua Univ, BP Clean Energy Res & Educ Ctr, Shunde Bldg, Beijing 100084, Peoples R China
[3] Gen Elect Switzerland GmbH, Brown Boveri Str 7, CH-5401 Baden, Switzerland
[4] Gen Elect Power AG, Boveristr 22, D-68309 Mannheim, Germany
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Combined cycle power plants (CCPP) have many advantages compared to other fossil power plants: high efficiency, flexible operation, compact design, high potential for combined heat and power (CHP) applications and fewer emissions. However, fuel costs are relatively high compared to coal. Nevertheless, major qualities such as high operation flexibility and low emissions distinctly increase in relevance in the future, due to rising power generation from renewable energy sources. An accelerated start-up procedure of CCPPs increases the flexibility and reduces the NOR -emissions, which are relatively high in gas turbine low load operation. Such low load operation is required during a cold start of a CCPP in order to heat up the steam turbine. Thus, a warm -keeping of the thermal -limiting steam turbine results in an accelerated start-up times as well as reduced NOR -emissions and lifetime consumption. This paper presents a theoretical analysis of the potential of steam turbine warm-keeping by means of hot air for a typical CCPP, located in China. In this method, the hot air passes through the steam turbine while the power plant is shut off which enables hot start conditions at any time. In order to investigate an improved start-up procedure, a physical based simplified model of the water-steam cycle is developed on the basis of an operation data set. This model is used to simulate an improved power plant start-up, in which the steam turbine remains hot after at least 120 hours outage. The results show a start-up time reduction of approximately two-thirds in comparison to a conventional cold start. Furthermore, the potential of steam turbine warm-keeping is discussed with regards to the power output, NOR -emissions, start-up costs and lifetime consumption.
引用
收藏
页数:12
相关论文
共 45 条
  • [1] COMPARISON OF STEAM TURBINE PRE-WARMING AND WARM-KEEPING STRATEGIES USING HOT AIR FOR FAST TURBINE START-UP
    Pehle, Lukas
    Luczynski, Piotr
    Jeon, Taejun
    Wirsum, Manfred
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, VOL 9, 2020,
  • [2] INVESTIGATION OF STEAM TURBINE WARM-KEEPING BY USE OF AIR
    Toebben, Dennis
    Luczynski, Piotr
    Wirsum, Manfred
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, 2019, VOL 8, 2019,
  • [3] Investigation of Steam Turbine Warm-Keeping by Use of Air
    Toebben, Dennis
    Luczynski, Piotr
    Wirsum, Manfred
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (11):
  • [4] ANALYTICAL HEAT TRANSFER CORRELATION FOR A MULTISTAGE STEAM TURBINE IN WARM-KEEPING OPERATION WITH AIR
    Toebben, Dennis
    Hellmig, Adrian
    Luczynski, Piotr
    Wirsum, Manfred
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, 2018, VOL 8, 2018,
  • [5] Analytical Heat Transfer Correlation for a Multistage Steam Turbine in Warm-Keeping Operation With Air
    Toebben, Dennis
    Hellmig, Adrian
    Luczynski, Piotr
    Wirsum, Manfred
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (01):
  • [6] Unsteady Conjugate Heat Transfer Investigation of a Multistage Steam Turbine in Warm-Keeping Operation With Hot Air
    Luczynski, Piotr
    Toebben, Dennis
    Wirsum, Manfred
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (01):
  • [7] UNSTEADY CONJUGATE HEAT TRANSFER INVESTIGATION OF A MULTISTAGE STEAM TURBINE IN WARM-KEEPING OPERATION WITH HOT AIR
    Luczynski, Piotr
    Toebben, Dennis
    Wirsum, Manfred
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, 2018, VOL 8, 2018,
  • [8] Numerical Investigation of the Heat Transfer and Flow Phenomena in an IP Steam Turbine in Warm-Keeping Operation with Hot Air
    Toebben, Dennis
    Luczynski, Piotr
    Diefenthal, Mathias
    Wirsum, Manfred
    Reitschmidt, Stefan
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 8, 2017,
  • [9] Optimization of steam turbine start-up based on nonlinear function
    Dong, Chao
    Wang, Bin
    Sun, Yongjian
    Wang, Xiaohong
    [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 505 - 510
  • [10] Start-Up Optimization of a CCGT Power Station Using Model-Based Gas Turbine Control
    Nannarone, Alessandro
    Klein, Sikke A.
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (04):