Analysis of the running-in phase of a Passively Safe Thorium Breeder Pebble Bed Reactor

被引:2
|
作者
Wols, F. J. [1 ]
Kloosterman, J. L. [1 ]
Lathouwers, D. [1 ]
van der Hagen, T. H. J. J. [1 ]
机构
[1] Delft Univ Technol, Dept Radiat Sci & Technol, NL-2629 JB Delft, Netherlands
关键词
Running-in phase; Pebble Bed Reactor; Thorium breeder; Passive safety; FUEL; DESIGN;
D O I
10.1016/j.anucene.2015.02.043
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The present work investigates the running-in phase of a 100 MWth Passively Safe Thorium Breeder Pebble Bed Reactor (PBR), a conceptual design introduced in previous equilibrium core design studies by the authors. Since U-233 is not available in nature, an alternative fuel, e.g. U-235/U-238, is required to start such a reactor. This work investigates how long it takes to converge to the equilibrium core composition and to achieve a net production of U-233, and how this can be accelerated. For this purpose, a fast and flexible calculation scheme was developed to analyze these aspects of the running-in phase. Depletion equations with an axial fuel movement term are solved in MATLAB for the most relevant actinides (Th-232, Pa-233, U-233, U-234, U-235, U-236 and U-238) and the fission products are lumped into a fission product pair. A finite difference discretization is used for the axial coordinate in combination with an implicit Euler time discretization scheme. Results show that a time dependent adjustment scheme for the enrichment (in case of U-235/U-238 start-up fuel) or U-233 weight fraction of the feed driver fuel helps to restrict excess reactivity, to improve the fuel economy and to achieve a net production of U-233 faster. After using U-235/U-238 start-up fuel for 1300 days, the system starts to work as a breeder, i.e. the U-233 (and Pa-233) extraction rate exceeds the U-233 feed rate, within 7 years after start of reactor operation. The final part of the work presents a basic safety analysis, which shows that the thorium PBR fulfills the same passive safety requirements as the equilibrium core during every stage of the running-in phase. The maximum fuel temperature during a Depressurized Loss of Forced Cooling (DLOFC) with scram remains below 1400 degrees C throughout the running-in phase, quite a bit below the TRISO failure temperature of 1600 degrees C. The uniform reactivity coefficients of cores with U-2351U-238 driver fuel are much stronger negative compared to U-233/Th driver fuel, which implies that the stronger reactivity insertion by water ingress and the reactivity addition by xenon decay during a DLOFC without scram can be compensated without fuel temperatures exceeding 1600 degrees C. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:227 / 239
页数:13
相关论文
共 50 条
  • [1] Conceptual design of a passively safe thorium breeder Pebble Bed Reactor
    Wols, F. J.
    Kloosterman, J. L.
    Lathouwers, D.
    van der Hagen, T. H. J. J.
    [J]. ANNALS OF NUCLEAR ENERGY, 2015, 75 : 542 - 558
  • [2] Reactivity control system of a passively safe thorium breeder pebble bed reactor
    Wols, F. J.
    Kloosterman, J. L.
    Lathouwers, D.
    van der Hagen, T. H. J. J.
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2014, 280 : 598 - 607
  • [3] Physical Analysis of the Initial Core and Running-In Phase for Pebble-Bed Reactor HTR-PM
    Zhang, Jingyu
    Li, Fu
    Sun, Yuliang
    [J]. SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2017, 2017
  • [4] PERFORMANCE OF THORIUM FUEL CYCLES IN PEBBLE BED REACTOR
    TEUCHERT, E
    RUTTEN, HJ
    WERNER, H
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1976, 24 (NOV19): : 222 - 222
  • [5] CORE DESIGN AND FUEL MANAGEMENT STUDIES OF A THORIUM-BREEDER PEBBLE BED HIGH-TEMPERATURE REACTOR
    Wols, Frank
    Kloosterman, Jan Leen
    Lathouwers, Danny
    Van der Hagen, Tim
    [J]. NUCLEAR TECHNOLOGY, 2014, 186 (01) : 1 - 16
  • [6] Towards an intrinsically safe and economic thorium breeder reactor
    Light Water Reactor Physics Section, Reactor Physics Design Division, Bhabha Atomic Research Centre, Mumbai - 400085, India
    [J]. 1600, 1214-1257 (2005):
  • [7] Towards an intrinsically safe and economic thorium breeder reactor
    Jagannathan, V.
    Pal, Usha
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2006, 47 (17) : 2781 - 2793
  • [8] Thorium and plutonium utilisation in pebble-bed modular reactor
    Sikik, UE
    Dikmen, H
    Çeçen, Y
    Çolak, Ü
    Kadiroglu, OK
    [J]. ADVANCED REACTORS WITH INNOVATIVE FUELS, WORKSHOP PROCEEDINGS, 2002, : 57 - 61
  • [9] PERFORMANCE OF THORIUM FUEL CYCLES IN PEBBLE-BED REACTOR
    TEUCHERT, E
    RUTTEN, HJ
    WERNER, H
    [J]. NUCLEAR TECHNOLOGY, 1978, 38 (03) : 374 - 383
  • [10] The implication of Thorium fraction on neutronic parameters of pebble bed reactor
    Zuhair
    Dwijayanto, R. Andika Putra
    Suwoto
    Setiadipura, Topan
    [J]. KUWAIT JOURNAL OF SCIENCE, 2021, 48 (03)