共 50 条
- [3] Modeling of the Mount Isa rougher-scavenger copper flotation circuit using size-by-liberation data Mining, Metallurgy & Exploration, 2000, 17 : 173 - 180
- [5] MODEL BASED PREDICTIVE CONTROL OF A ROUGHER FLOTATION CIRCUIT CONSIDERING GRADE ESTIMATION IN INTERMEDIATE CELLS DYNA-COLOMBIA, 2011, 78 (166): : 29 - 37
- [7] Adapting a Phenomenological Model of a Rougher Flotation Circuit to Industrial Historical Operating Data Base IFAC PAPERSONLINE, 2018, 51 (21): : 111 - 116
- [8] Adapting a Phenomenological Model of a Rougher Flotation Circuit to Industrial Historical Operating Data Base 2018 IEEE 14TH INTERNATIONAL CONFERENCE ON CONTROL AND AUTOMATION (ICCA), 2018, : 492 - 497
- [10] Lead ions and sphalerite recovery in copper rougher flotation MINERAL PROCESSING/ENVIRONMENT, HEALTH AND SAFETY, 1999, : 145 - 157