A Framework for Selecting Construction Project Delivery Method Using Design Structure Matrix

被引:4
|
作者
Zhong, Qingping [1 ]
Tang, Hui [1 ]
Chen, Chuan [2 ]
机构
[1] Sichuan Univ, Inst Disaster Management & Reconstruct, Chengdu 610065, Peoples R China
[2] Sichuan Univ, Business Sch, Chengdu 610065, Peoples R China
基金
中国国家自然科学基金;
关键词
project delivery method; PDM; procurement selection; delivery selection; design structure matrix; DSM; DEPENDENCY STRUCTURE MATRIX; SYSTEM SELECTION; MODEL; DECOMPOSITION; UNCERTAINTY; STRENGTH; CHOICE;
D O I
10.3390/buildings12040443
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Determining a project delivery method that matches the characteristics of a construction project is a critical step that affects the success or failure of a project. The Project Delivery Method (PDM) should be adapted to the activities and processes of project implementation. However, the traditional selection method does not come from the internal process of the project which may lead to the delivery method not being able to meet the actual project requirements. This research proposes a DSM-based PDM selection framework model that regroups activities and identifies appropriate PDMs by revealing the dependencies and intensities between activities. The research uses a case to demonstrate the feasibility of the framework. After considering specific project requirements and goals, the framework model can be used as a basis for choosing specific project delivery methods, or as a visualization tool to help owners schedule activities.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Design Framework for Construction Project Delivery Systems
    Li, Huimin
    Wang, Zhuofu
    Liu, Hongmei
    TECHNICS TECHNOLOGIES EDUCATION MANAGEMENT-TTEM, 2010, 5 (04): : 847 - 852
  • [2] Project Delivery Selection Matrix for Highway Design and Construction
    Tran, Dai Q.
    Harper, Christofer M.
    Molenaar, Keith R.
    Haddad, Nabil F.
    Scholfield, Mark M.
    TRANSPORTATION RESEARCH RECORD, 2013, (2347) : 3 - 10
  • [3] An Integrated Framework for Selecting the Optimum Project Delivery System in Post-conflict Construction Projects
    Pooyan, Mahmood-Reza
    Al-Sakkaf, Abobakr
    Abdelkader, Eslam Mohammed
    Zayed, Tarek
    Gopakumar, Govind
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2023, 21 (08) : 1359 - 1384
  • [4] An Integrated Framework for Selecting the Optimum Project Delivery System in Post-conflict Construction Projects
    Mahmood-Reza Pooyan
    Abobakr Al-Sakkaf
    Eslam Mohammed Abdelkader
    Tarek Zayed
    Govind Gopakumar
    International Journal of Civil Engineering, 2023, 21 : 1359 - 1384
  • [5] Critical Chain Design Structure Matrix Method for Construction Project Scheduling under Rework Scenarios
    Ma, Guofeng
    Hao, Keke
    Xiao, Yu
    Zhu, Tiancheng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [6] Relevant criteria for selecting project delivery methods in sustainable construction
    Ahmed, Salma
    El-Sayegh, Sameh
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (05) : 512 - 520
  • [7] Project Portfolio Model Using the Design Structure Matrix
    Li, Sui-ke
    Bai, Si-jun
    NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 96 - 99
  • [8] Novel Integration of Sustainable and Construction Decisions into the Design Bid Build Project Delivery Method Using BPMN
    Ali, Ahmed K.
    Badinelli, Ralph
    ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 164 - 171
  • [9] Choosing an Appropriate Construction Project Delivery Method Using FAHP in China
    Zhang, X. L.
    Wang, L. H.
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 78 - +
  • [10] Analysis on the design of delivery methods of the construction project
    Wang, Zhuo-Fu
    Wang, Min
    Hong, Wei-Min
    INTERNATIONAL CONFERENCE ON MANAGEMENT INNOVATION, VOLS 1 AND 2, 2007, : 910 - 915