Waste management plans for ITER

被引:20
|
作者
Rosanvallon, S. [1 ]
Torcy, D. [1 ]
Chon, J. K. [1 ]
Dammann, A. [1 ]
机构
[1] ITER Org, CS 90 046, F-13067 St Paul Les Durance, France
关键词
ITER; Nuclear; Waste; Characterization; Decommissioning; TRITIUM;
D O I
10.1016/j.fusengdes.2015.12.002
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
ITER will produce radioactive waste during its operation (arising from the replacement of components and from process and housekeeping waste) and during decommissioning. The waste concerns components that are activated by neutrons of energies up to 14 MeV, and are contaminated by activated corrosion products, activated dust and tritium. Even if the nuclear waste production will start only with the deuterium-deuterium phase, provisions have to be taken now with the design of the ITER facilities that will be used for the treatment and interim storage of the waste, in order to demonstrate that all the ITER waste will be safely manageable with the existing outlets. This demonstration also needs to be provided to the French regulator. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:1442 / 1446
页数:5
相关论文
共 50 条
  • [1] ITER waste management
    Rosanvallon, S.
    Na, B. C.
    Benchikhoune, M.
    Uzan, J. Elbez
    Gastaldi, O.
    Taylor, N.
    Rodriguez, L.
    FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) : 1788 - 1791
  • [2] MANAGEMENT OF TRITIUM IN ITER WASTE
    Rosanvallon, S.
    Benchikhoune, M.
    Ciattaglia, S.
    Uzan, J. Elbez
    Gastaldi, O.
    Na, B. C.
    Taylor, N.
    FUSION SCIENCE AND TECHNOLOGY, 2011, 60 (03) : 855 - 860
  • [3] The status of ITER radioactive waste management and enlightenment to CFETR radioactive waste management
    Wang X.
    Pan S.
    Zhao Q.
    Zhang H.
    Li R.
    Chen C.
    Wang J.
    He Jishu/Nuclear Techniques, 2022, 45 (09):
  • [4] ITER waste management: The recycling and clearance option
    Rocco, P
    Zucchetti, M
    FUSION TECHNOLOGY, 1996, 30 (03): : 1550 - 1556
  • [5] Waste management within the framework of ITER in Cadarache
    Rosanvallon, S
    Nordlinder, S
    Fayette, L
    Brunel, G
    FUSION ENGINEERING AND DESIGN, 2003, 69 (1-4) : 531 - 536
  • [6] STATUS AND PLANS FOR ITER
    GLASS, AJ
    JOURNAL OF FUSION ENERGY, 1992, 11 (02) : 59 - 62
  • [7] ASSEMBLY PLANS FOR ITER
    PUHN, FA
    OIKAWA, A
    FUSION TECHNOLOGY, 1994, 26 (03): : 292 - 299
  • [8] Initial tritium waste management criteria and assessment for ITER
    Ionesyan, IA
    Kapychev, VK
    Tebus, VN
    Frolov, VN
    FUSION ENGINEERING AND DESIGN, 1998, 42 : 149 - 154
  • [9] Initial tritium waste management criteria and assessment for ITER
    Ionesyan, I.A.
    Kapychev, V.K.
    Tebus, V.N.
    Frolov, V.N.
    Fusion Engineering and Design, 1998, 42 (Pt C): : 149 - 154
  • [10] Waste management plans: Tools for sustainable development
    Grzesik, K
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2005, 14 (05): : 703 - 706