A novel Stochastic model for the GenCos self-scheduling in a restructured electricity market

被引:0
|
作者
Yamin, H. Y. [1 ]
机构
[1] Yarmouk Univ, Al Hijawwi Fac Engn Technol, Power Engn Dept, Irbid, Jordan
关键词
restructured power market; stochastic model; self scheduling;
D O I
10.1109/UPEC.2007.4469098
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents the formulation of a novel stochastic model for the GenCos' self-scheduling (GSS) problem in a restructured electricity market. The stochastic model is designed for GenCos' portfolio management utilizing the GSS which is a self scheduling for profit maximization. The proposed model incorporates a probabilistic approach for the evaluation of composite reliability of generation, load forecast and fuel prices using different probability distributions. Different scenarios will be generated from the Monte Carlo simulation. Each scenario is an input to GSS. The results of different GSS runs will be displayed in form. of profit/loss probability distribution to analyze the risk in an uncertain power market. This model can be used by GenCos in some restructured markets where GenCos are responsible for self scheduling, to commit and schedule their units for selling power, spinning and non-spinning reserves in order to maximize their own profit and would be interested in determining the risk associated with different scenarios. The proposed model can be used for exploring the arbitrage opportunities between energy and ancillary services.
引用
收藏
页码:1065 / 1069
页数:5
相关论文
共 50 条
  • [1] Fuzzy self-scheduling for GenCos
    Yamin, HY
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (01) : 503 - 505
  • [2] Risk and profit in self-scheduling for GenCos
    Yamin, HY
    Shahidehpour, SM
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (04) : 2104 - 2106
  • [3] Risk-minimizing stochastic self-scheduling model for microgrid in day-ahead electricity market
    Yazdaninejad, Mohsen
    Amjady, Nima
    [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2017, 27 (05):
  • [4] Optimal self-scheduling of hydro producer in the electricity market
    Yuan, Xiaohui
    Wang, Yunyan
    Xie, Jun
    Qi, Xiwen
    Nie, Hao
    Su, Anjun
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2010, 51 (12) : 2523 - 2530
  • [5] Risk-based self-scheduling for GenCos in the day-ahead competitive electricity markets
    Yamin, H. Y.
    Altawil, I. A.
    Al-Ajlouni, A. F.
    Shahidehpour, S. M.
    [J]. EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2009, 19 (01): : 103 - 112
  • [6] Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic electricity market
    Ghazvini, Mohammad Ali Fotouhi
    Canizes, Bruno
    Vale, Zita
    Morais, Hugo
    [J]. APPLIED ENERGY, 2013, 101 : 667 - 677
  • [7] Copula Based Self Scheduling Model for Risk Averse GenCo in Restructured Electricity Market
    Panda, Dehasmita
    Singh, S. N.
    Kumar, Vimal
    [J]. 2017 7TH INTERNATIONAL CONFERENCE ON POWER SYSTEMS (ICPS), 2017, : 370 - 375
  • [8] Hydrothermal self-scheduling problem in a day-ahead electricity market
    Bisanovic, Smajo
    Hajro, Mensur
    Dlakic, Muris
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2008, 78 (09) : 1579 - 1596
  • [9] Self-scheduling of a hydro producer in a pool-based electricity market
    Conejo, AJ
    Arroyo, JM
    Contreras, J
    Villamor, FA
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) : 1265 - 1272
  • [10] Integrated Stochastic Optimal Self-Scheduling for Two-Settlement Electricity Markets
    Pan, Kai
    Guan, Yongpei
    [J]. INFORMS JOURNAL ON COMPUTING, 2022, 34 (03) : 1819 - 1840