共 50 条
- [1] Fuzzy self-scheduling for GenCos [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (01) : 503 - 505
- [2] Risk and profit in self-scheduling for GenCos [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (04) : 2104 - 2106
- [3] Risk-minimizing stochastic self-scheduling model for microgrid in day-ahead electricity market [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2017, 27 (05):
- [5] Risk-based self-scheduling for GenCos in the day-ahead competitive electricity markets [J]. EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2009, 19 (01): : 103 - 112
- [7] Copula Based Self Scheduling Model for Risk Averse GenCo in Restructured Electricity Market [J]. 2017 7TH INTERNATIONAL CONFERENCE ON POWER SYSTEMS (ICPS), 2017, : 370 - 375