A bi-level programming for transportation services procurement based on combinatorial auction with fuzzy random parameters

被引:6
|
作者
Yan, Fang [1 ]
Ma, Yanfang [2 ]
Feng, Cuiying [3 ]
机构
[1] Chongqing Jiaotong Univ, Sch Econ & Management, Chongqing, Peoples R China
[2] Hebei Univ Technol, Sch Econ & Management, Tianjin, Peoples R China
[3] Zhejiang Univ Technol, Coll Econ & Management, Hangzhou, Zhejiang, Peoples R China
基金
中国博士后科学基金;
关键词
Discrete particle swarm optimization; Bi-level programming; Combinatorial transportation auctions; Fuzzy random; Winner determination; PARTICLE SWARM OPTIMIZATION; VEHICLE-ROUTING PROBLEM; STOCHASTIC TRAVEL; GENERATION PROBLEM; ALGORITHM; CARRIERS; SYSTEM; MODEL;
D O I
10.1108/APJML-07-2017-0154
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose - The purpose of this paper is to study a transportation service procurement bid construction problem from a less than a full truckload perspective. It seeks to establish stochastic mixed integer programming to allow for the proper bundle of loads to be chosen based on price, which could improve the likelihood that carrier can earn its maximum utility. Design/methodology/approach - The authors proposes a bi-level programming that integrates the bid selection and winner determination and a discrete particle swarm optimization (PSO) solution algorithm is then developed, and a numerical simulation is used to make model and algorithm analysis. Findings - The algorithm comparison shows that although GA could find a little more Pareto solutions than PSO, it takes a longer time and the quality of these solutions is not dominant. The model analysis shows that compared with traditional approach, our model could promote the likelihood of winning bids and the decision effectiveness of the whole system because it considers the reaction of the shipper. Originality/value - The highlights of this paper are considering the likelihood of winning the business and describing the conflicting and cooperative relationship between the carrier and the shipper by using a stochastic mixed integer programming, which has been rarely examined in previous research.
引用
收藏
页码:1162 / 1182
页数:21
相关论文
共 50 条
  • [1] Pareto Optimality for Bi-level Programming Problem with Fuzzy Parameters
    Mahmoud A. Abo-Sinna
    OPSEARCH, 2001, 38 (4) : 372 - 393
  • [2] Solving bi-level programming problem with fuzzy random variable coefficients
    Singh, Vishnu Pratap
    Chakraborty, Debjani
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 32 (01) : 521 - 528
  • [3] A Class of Chance Constrained Linear Bi-Level Programming with Random Fuzzy Coefficients
    Zhou, Xiaoyang
    Tu, Yan
    Hu, Ruijia
    Lev, Benjamin
    PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2015, 362 : 423 - 433
  • [4] Bi-Level linear programming of intuitionistic fuzzy
    Nazek A. Alessa
    Soft Computing, 2021, 25 : 8635 - 8641
  • [5] Bi-Level linear programming of intuitionistic fuzzy
    Alessa, Nazek A.
    SOFT COMPUTING, 2021, 25 (13) : 8635 - 8641
  • [6] A class of random fuzzy linear bi-level programming with expected objectives and chance constraints
    Zhou, Xiaoyang
    Tu, Yan
    Lu, Quanying
    Chai, Jian
    2014 SEVENTH INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION (CSO), 2014, : 651 - 655
  • [7] Continuous Transportation Network Design Problem Based on Bi-level Programming Model
    Sun, Zhichen
    GREEN INTELLIGENT TRANSPORTATION SYSTEM AND SAFETY, 2016, 138 : 277 - 282
  • [8] Tolling of Expressway Transportation Networks for Hazardous Materials Based on Bi-level Programming
    Feng X.
    Zhang L.
    Tongji Daxue Xuebao/Journal of Tongji University, 2020, 48 (05): : 710 - 715and750
  • [9] Fuzzy approach for Bi-level programming problems(II)
    Pei, Zheng
    Huang, Tianmin
    2000, Sci Publ House (35):
  • [10] Fuzzy approach for Bi-level programming problems(II)
    Pei, Zheng
    Huang, Tianmin
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2000, 35 (01): : 98 - 101