A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography

被引:13
|
作者
Akçali, E [1 ]
Uzsoy, R [1 ]
机构
[1] Purdue Univ, Sch Ind Engn, W Lafayette, IN 47907 USA
关键词
D O I
10.1109/IEMT.2000.910749
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper we study the shift scheduling problem for photolithography workcenters, which involves specifying the start and finish times for individual lots over the duration of the shift. For the schedule to be accurate the operational policies (such as setup control policies) and auxiliary resources of the workcenter (such as reticles) need to be considered, which further complicates the problem. We present a sequential procedure that separates the problem into capacity allocation and lot sequencing sub-problems. Although solving these problems sequentially is not a new idea, the lack of empirical evidence of the benefits and insight into implementation issues motivate this research. We use a simulation model of a wafer fabrication facility to examine the effects df using this procedure for scheduling of the photolithography operations. We show that the procedure is a viable method to schedule photolithography workcenter. The choice of the time horizon over which the capacity allocation problem is solved affects cycle time metrics and the number of setups significantly. However, varying reticle and setup constraints has little impact. Finally, we show that the procedure is sensitive to the structure of the operation-stepper matrix and suggest a remedy to overcome the problem.
引用
收藏
页码:374 / 381
页数:2
相关论文
共 50 条
  • [1] Solution Methodology for Scheduling Problems in Batch Plants
    Moniz, Samuel
    Barbosa-Povoa, Ana Paula
    de Sousa, Jorge Pinho
    Duarte, Pedro
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2014, 53 (49) : 19265 - 19281
  • [2] Capacity allocation with lot splitting in photolithography area using hybrid genetic algorithm based on self-tuning strategy
    Chen, James C.
    Chen, Tzu-Li
    Hung, Hsiao-Ching
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 148
  • [3] A solution procedure for Economic Lot Scheduling Problems even in high utilisation facilities
    Holmbom, Martin
    Segerstedt, Anders
    van der Sluis, Erik
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3765 - 3777
  • [4] Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility
    Arisha, A
    Young, P
    [J]. PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1935 - 1942
  • [5] Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems
    Gislaine Mara Melega
    Silvio Alexandre de Araujo
    Reinaldo Morabito
    [J]. Annals of Operations Research, 2020, 295 : 695 - 736
  • [6] Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems
    Melega, Gislaine Mara
    de Araujo, Silvio Alexandre
    Morabito, Reinaldo
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 295 (02) : 695 - 736
  • [7] The economic lot scheduling problem without capacity constraints
    Yao, MJ
    [J]. ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 193 - 205
  • [8] A CYCLICAL SCHEDULING HEURISTIC FOR LOT SIZING WITH CAPACITY CONSTRAINTS
    BAHL, HC
    RITZMAN, LP
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (05) : 791 - 800
  • [9] The Economic Lot Scheduling Problem without Capacity Constraints
    Ming-Jong Yao
    [J]. Annals of Operations Research, 2005, 133 : 193 - 205
  • [10] Capacity Allocation and Scheduling in Supply Chains
    Hall, Nicholas G.
    Liu, Zhixin
    [J]. OPERATIONS RESEARCH, 2010, 58 (06) : 1711 - 1725