共 50 条
- [2] Model and Algorithms on Utilization Plan of Shunting Locomotive for Railway Passenger Station ADVANCES IN FUTURE COMPUTER AND CONTROL SYSTEMS, VOL 2, 2012, 160 : 45 - 50
- [3] Study of the simulation system of train and shunting operation process at railway station (yard) Beifang Jiaotong Daxue Xuebao/Journal of Northern Jiaotong University, 2000, 24 (03): : 50 - 54
- [5] Train station passenger flow study PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2000, : 1173 - 1176
- [6] The upgrading of ITS in railway passenger station TRAFFIC AND TRANSPORTATION STUDIES, 1998, : 945 - 954
- [7] Scheduling Method for Integrated Plan of Train Operation and Shunting Operation in High-speed Railway Station Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2021, 21 (03): : 176 - 186
- [8] Train operation and dispatching system for railway large-scale passenger station based on component technology Zhongguo Tiedao Kexue/China Railway Science, 2008, 29 (03): : 122 - 127
- [10] ROUTING AND SCHEDULING TRAINS AT A PASSENGER RAILWAY STATION PROCEEDINGS OF THE INTERNATIONAL CONFERENCE QUANTITATIVE METHODS IN ECONOMICS (MULTIPLE CRITERIA DECISION MAKING XVI), 2012, : 108 - 114