Investment decisions under uncertainties in geothermal power generation

被引:4
|
作者
Dewi, Marmelia P. [1 ]
Setiawan, Andri D. [2 ]
Latief, Yusuf [1 ]
Purwanto, Widodo Wahyu [3 ]
机构
[1] Univ Indonesia, Fac Engn, Civil Engn Dept, Depok, Indonesia
[2] Univ Indonesia, Fac Engn, Ind Engn Dept, Depok, Indonesia
[3] Univ Indonesia, Fac Engn, Chem Engn Dept, Depok, Indonesia
关键词
uncertainty; real options analysis; geothermal project investments; geothermal power plant; NPV; RENEWABLE ENERGY PROJECTS; REAL OPTIONS VALUATION; STRATEGIES; IMPACT; RISK;
D O I
10.3934/energy.2022038
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Geothermal energy is one of the strategies employed by the Indonesian government to meet rising electricity demand. Developing geothermal energy is often characterized by uncertainties and requires sequential decision-making which is divided into four development phases: 1) identification, 2) exploration, 3) exploitation, and 4) engineering, procurement, construction, and commissioning (EPPC) before it can be commercialized. Traditional valuation techniques often produce a negative net present value (NPV), suggesting decision to reject the project's investment plan. This paper investigates the economic viability of a geothermal power generation project using both NPV and real options analysis (ROA). Costs and uncertainties associated with the various development phases as well as the investment structure of geothermal projects are studied. We develop a framework for assessing the impact of four uncertainties using a binomial lattice: capacity factor, electricity price, make-up well -drilling costs, and operation and maintenance (O&M) costs. Secondary data from an Indonesian context geothermal power plant was used. Positive option values were found for the lattice approach compared to negative values found for the common NPV calculation. The result of this study showed the successful outcome of the exploration stage is very critical to determining the continuation of the project. The framework supports decision-makers in evaluating the impact of geothermal power generation projects in the face of uncertainty by providing a rigorous analysis. The movement of the underlying asset's value in the whole project's lifetime will assist the management in deciding on whether to exit or continue.
引用
收藏
页码:844 / 857
页数:14
相关论文
共 50 条
  • [1] Generation Scheduling in Microgrids under Uncertainties in Power Generation
    Alabedin, A. M. Zein
    El-Saadany, E. F.
    Salama, M. M. A.
    2012 IEEE ELECTRICAL POWER AND ENERGY CONFERENCE (EPEC), 2012, : 133 - 138
  • [2] Investment strategy of hydrothermal geothermal heating in China under policy, technology and geology uncertainties
    Zhang, Qi
    Chen, Siyuan
    Tan, Zhizhou
    Zhang, Tiantian
    Mclellan, Benjamin
    JOURNAL OF CLEANER PRODUCTION, 2019, 207 : 17 - 29
  • [3] System Dynamics Modelling of Photovoltaic Power Generation Investment Decisions
    Alvarez-Pomar, Lindsay
    Ricaurte-Montoya, Edward
    Gomez-Vargas, Ernesto
    APPLIED COMPUTER SCIENCES IN ENGINEERING, WEA 2018, PT I, 2018, 915 : 270 - 279
  • [4] Robust geothermal investment decisions under uncertainty: An exploratory financial modeling and analysis approach
    Adam, Samuel
    Setiawan, Andri D.
    Dewi, Marmelia P.
    ENERGY, 2025, 314
  • [5] Strategic investment decisions under the nuclear power debate in Belgium
    de Frutos Cachorro, J.
    Willeghems, G.
    Buysse, J.
    RESOURCE AND ENERGY ECONOMICS, 2019, 57 : 156 - 184
  • [6] Investment under Monetary Uncertainties
    Pankova, Vaclava
    PROCEEDINGS OF THE 24TH INTERNATIONAL CONFERENCE ON MATHEMATICAL METHODS IN ECONOMICS 2006, 2006, : 415 - 418
  • [7] US policy uncertainties cloud refiners' investment decisions
    不详
    HYDROCARBON PROCESSING, 2007, 86 (09): : 21 - +
  • [8] Investment cost for geothermal power plants
    Stefánsson, V
    GEOTHERMICS, 2002, 31 (02) : 263 - 272
  • [9] Investment in hydrogen tri-generation for wastewater treatment plants under uncertainties
    Gharieh, Kaveh
    Jafari, Mohsen A.
    Guo, Qizhong
    JOURNAL OF POWER SOURCES, 2015, 297 : 302 - 314
  • [10] Robustness and Real Options for Vehicle Design and Investment Decisions Under Gas Price and Regulatory Uncertainties
    Kang, Namwoo
    Bayrak, Alparslan Emrah
    Papalambros, Panos Y.
    JOURNAL OF MECHANICAL DESIGN, 2018, 140 (10)