Agile PM and BIM: A hybrid scheduling approach for a technological construction project

被引:14
|
作者
Tomek, Radan [1 ]
Kalinichuk, Sergey [1 ]
机构
[1] Czech Tech Univ, Fac Civil Engn, Thakurova 7, Prague 16629 6, Dejvice, Czech Republic
关键词
Activity overlapping; Agile Project Management; Building Information Modeling; Hybrid Scheduling Approach; PRODUCT DEVELOPMENT; INFORMATION; FRAMEWORK; TIME;
D O I
10.1016/j.proeng.2015.10.108
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper introduces synthesis of the Agile Project Management and Building Information Modeling in construction industry and its practical application with the accent on economic incentives of their implementation as the most significant factor. The executed synthesis of both concepts' features leads to the representation of the general process of integration, thereby the general development of integrated product and process model for addressing the on-site management phase of a construction project. That is when Building Information Modeling technology plays a key role in Agile method not only as the technological container for information model of a construction project, but as a new construction approach bringing in the additional benefits described in the literature. (C) 2015 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:557 / 564
页数:8
相关论文
共 50 条
  • [1] A Hybrid Approach to Quantitative Software Project Scheduling Within Agile Frameworks
    Jahr, Michael
    [J]. PROJECT MANAGEMENT JOURNAL, 2014, 45 (03) : 35 - 45
  • [2] Investigating the Agile Hybrid Approach in Construction
    Ozorhon, Beliz
    Cardak, Fatih
    Caglayan, Semih
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (04)
  • [3] An agile scheduling and control approach in ETO construction supply chains
    Dallasega, Patrick
    Rojas, Rafael A.
    Bruno, Giulia
    Rauch, Erwin
    [J]. COMPUTERS IN INDUSTRY, 2019, 112
  • [4] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
    Roslon, Jerzy Hubert
    Kulejewski, Janusz Edward
    [J]. OPEN ENGINEERING, 2019, 9 (01): : 7 - 13
  • [5] Developing a Risk Management Framework in Construction Project Based on Agile Management Approach
    Ahmed, Mohammed Neamah
    Mohammed, Sawsan Rasheed
    [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (03): : 608 - 615
  • [6] Learning to Solve the Agile Earth Observation Satellite Scheduling Problem by a Hybrid Repair Construction Method
    Chun, Jie
    Chen, Ming
    Zuo, Yahui
    Liu, Zhehan
    Liu, Jinming
    Liu, Xiaolu
    [J]. 2024 5TH INTERNATIONAL CONFERENCE ON GEOLOGY, MAPPING AND REMOTE SENSING, ICGMRS 2024, 2024, : 1 - 6
  • [7] Hybrid approach to project scheduling using neural network and PERT
    Ito, T
    [J]. 1998 JAPAN-U.S.A. SYMPOSIUM ON FLEXIBLE AUTOMATION - PROCEEDINGS, VOLS I AND II, 1998, : 377 - 382
  • [8] Hybrid approach for solving resourceconstrained software project scheduling problem
    Gul, Nurhan
    Arici, Nursal
    [J]. JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024,
  • [9] An agile process modelling approach for BIM projects
    Kannengiesser, U.
    Roxin, A.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2016, : 99 - 107
  • [10] SYSTEMS-APPROACH TO OFFSHORE CONSTRUCTION PROJECT-PLANNING AND SCHEDULING
    CHEN, H
    RAWSTRON, P
    [J]. MARINE TECHNOLOGY AND SNAME NEWS, 1983, 20 (04): : 332 - 347