共 50 条
- [4] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction [J]. OPEN ENGINEERING, 2019, 9 (01): : 7 - 13
- [5] Developing a Risk Management Framework in Construction Project Based on Agile Management Approach [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (03): : 608 - 615
- [6] Learning to Solve the Agile Earth Observation Satellite Scheduling Problem by a Hybrid Repair Construction Method [J]. 2024 5TH INTERNATIONAL CONFERENCE ON GEOLOGY, MAPPING AND REMOTE SENSING, ICGMRS 2024, 2024, : 1 - 6
- [7] Hybrid approach to project scheduling using neural network and PERT [J]. 1998 JAPAN-U.S.A. SYMPOSIUM ON FLEXIBLE AUTOMATION - PROCEEDINGS, VOLS I AND II, 1998, : 377 - 382
- [8] Hybrid approach for solving resourceconstrained software project scheduling problem [J]. JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024,
- [9] An agile process modelling approach for BIM projects [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2016, : 99 - 107
- [10] SYSTEMS-APPROACH TO OFFSHORE CONSTRUCTION PROJECT-PLANNING AND SCHEDULING [J]. MARINE TECHNOLOGY AND SNAME NEWS, 1983, 20 (04): : 332 - 347